Table T1. Coring summary, Site U1393.
| Hole: | U1393A |
| Latitude: | 16°43.1316′N |
| Longitude: | 62°5.0594′W |
| Water depth (m): | 926.0 |
| Date started (UTC*): | 1430 h 6 March 2012 |
| Date finished (UTC*): | 0630 h 8 March 2012 |
| Time on hole (days): | 1.7 |
| Seafloor depth DRF (m): | 937.3 |
| Penetration DSF (m): | 47.5 |
| Cored interval (m): | 47.5 |
| Recovered length (m): | 5.42 |
| Recovery (%): | 11 |
| Total cores (no.): | 7 |
| Core | Top depth drilled DSF (m) |
Bottom depth drilled DSF (m) |
Advanced (m) |
Recovered length (m) |
Curated length (m) |
Top depth cored CSF (m) |
Bottom depth recovered CSF (m) |
Recovery (%) |
Time on deck (UTC*) |
|---|---|---|---|---|---|---|---|---|---|
| 340-U1393A- | |||||||||
| 1H | 0.0 | 4.3 | 4.3 | 4.36 | 4.36 | 0.00 | 4.36 | 101 | 3/7/12 0835 |
| 2H | 4.3 | 4.4 | 0.1 | 0.01 | 0.01 | 4.30 | 4.31 | 10 | 3/7/12 0925 |
| 3X | 4.4 | 12.8 | 8.4 | 0.15 | 0.32 | 4.40 | 4.72 | 2 | 3/7/12 1305 |
| 4X | 12.8 | 18.8 | 6.0 | 0.20 | 0.16 | 12.80 | 12.96 | 3 | 3/7/12 1436 |
| 5X | 18.8 | 28.4 | 9.6 | 0.10 | 0.09 | 18.80 | 18.89 | 1 | 3/7/12 1845 |
| 6X | 28.4 | 38.0 | 9.6 | 0.22 | 0.23 | 28.40 | 28.63 | 2 | 3/7/12 2325 |
| 7X | 38.0 | 47.5 | 9.5 | 0.38 | 0.51 | 38.00 | 38.51 | 4 | 3/8/12 0445 |
| Totals: | 47.5 | 5.42 | 5.68 | ||||||
* = ship local time was Universal Time Coordinated (UTC) – 4 h. DRF = drilling depth below rig floor, DSF = drilling depth below seafloor, CSF = core depth below seafloor. H = advanced piston corer, X = extended core barrel.