Close   |    Next

Table T1. Operations summary, Hole U1415J.

Hole U1415J (install seafloor structure and casing; RCB coring):
Latitude: 2°15.1604′N
Longitude: 101°32.6622′W
Time at site (h): 383 (16 days) (0230 h, 31 December 2012–0130 h, 16 January)
Seafloor (drill pipe measurement below rig floor, m DRF): 4850.0
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, mbsl): 4838.8
Total penetration (drilling depth below seafloor, m DSF): 111.8
Total depth (drill pipe measurement from rig floor, m DRF): 4961.8
Total length of cored section (m): 91.8
Total core recovered (m): 14.35
Core recovery (%): 16
Drilled interval (m): 2
Total number of cores: 15 RCB, 9 ghost
Core Depth (mbsf) Interval cored
(m)
Core recovered
(m)
Curated length
(m)
Recovery
(%)
Date
(2013)
Time UTC
(h)
Top of cored
interval
Bottom of
cored interval
345-U1415J-
11 0.0 15.0 ****Drilled from 0.0 to 15.0 mbsf****
2G 10.0 15.0 — 0.20 0.13 — 3 Jan 1745
3R 15.0 22.2 7.2 0.68 0.86 9 4 Jan 0115
4R 22.2 26.2 4.0 0.18 0.22 5 4 Jan 0415
5R 26.2 34.9 8.7 1.88 2.08 22 4 Jan 1350
6G 29.0 34.9 — 0.33 0.45 — 4 Jan 2000
7G 29.0 34.9 — 1.54 2.05 — 5 Jan 0900
8R 34.9 45.2 10.3 3.22 4.39 31 5 Jan 1505
9R 45.2 55.3 10.1 0.94 1.10 9 5 Jan 2055
10R 55.3 65.0 9.7 0.55 0.62 6 6 Jan 0205
11R 65.0 69.7 4.7 0.41 0.50 9 6 Jan 0715
12R 69.7 74.7 5.0 0.74 1.56 15 6 Jan 1230
13R 74.7 79.4 4.7 0.59 0.65 13 6 Jan 1630
14G 37.0 79.4 — 0.15 0.25 — 7 Jan 0150
15G 37.0 45.0 — 0.64 0.69 — 7 Jan 1620
162 79.4 84.4 ****Drilled from 79.4 to 84.4 mbsf****
17G 79.4 84.4 — 0.12 0.12 — 12 Jan 0930
18R 84.4 89.1 4.7 1.50 1.50 32 12 Jan 1325
19R 89.1 94.1 5.0 0.77 0.94 15 12 Jan 1715
20R 94.1 98.8 4.7 0.19 0.20 4 12 Jan 2200
21R 98.8 101.8 3.0 1.39 1.62 46 13 Jan 0400
22G 82.0 101.8 — 0.07 0.12 — 13 Jan 0830
23R 101.8 103.8 2.0 0.53 0.53 27 13 Jan 1530
24G 74.0 101.0 — 0.21 0.27 — 13 Jan 2055
25G 99.0 103.8 — 0.48 0.57 — 15 Jan 0900
26R 103.8 111.8 8.0 0.78 0.75 10 15 Jan 1530
    Total: 91.8 14.35 17.52 16    

Local ship time was UTC – 7 h. Ghost core (G) is not included in totals. DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. R = rotary core barrel (RCB) system, numeric core type = drilled interval. — = not calculated.

Close   |    Next   |    Top of page