Table T1. Operations summary, Hole U1415O.
| Hole U1415O (failed attempt to establish reentry capability): | ||||||||
| Latitude: 2°15.1516′N | ||||||||
| Longitude: 101°32.5848′W | ||||||||
| Time on site (h): 29.50 (0145 h, 25 January–07150 h, 26 January 2013) | ||||||||
| Seafloor (drill pipe measurement below rig floor, m DRF): 4861.0 | ||||||||
| Distance between rig floor and sea level (m): 11.3 | ||||||||
| Water depth (drill pipe measurement from sea level, mbsl): 4849.7 | ||||||||
| Total penetration (drilling depth below seafloor, m DSF): 17.0 | ||||||||
| Total depth (drill pipe measurement from rig floor, m DRF): 4878.0 | ||||||||
| Total length of cored section (m): 0 | ||||||||
| Total core recovered (m): 0 | ||||||||
| Core recovery (%): 0 | ||||||||
| Drilled interval (m): 17.0 | ||||||||
| Total number of cores: 0 | ||||||||
| Core | Depth (mbsf) |
Interval cored (m) |
Core recovered (m) |
Curated length (m) |
Recovery (%) |
Date (2013) |
Time UTC (h) |
|
|---|---|---|---|---|---|---|---|---|
|
Top of cored interval |
Bottom of cored Interval |
|||||||
| 345-U1415O- | ||||||||
| 11 | 0.0 | 17.0 | ****Drilled from 0.0 to 17.0 mbsf**** | |||||
| Total: | — | — | — | — | ||||
Local ship time was UTC – 7 h. DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. Numeric core type = drilled interval. — = not calculated.