Previous   |   Close  

Table T3. Expedition 330 drilling operations. (See table note.)

 
 
Hole
U1372A
U1373A
U1374A
U1375A
U1375B
U1376A
U1377A
U1377B
Latitude 26°29.6017′S 28°33.8907′S 28°35.7513′S 33°41.9020′S 33°41.7860′S 32°13.0429′S 38°11.2500′S 38°11.2500′S
Longitude 174°43.7506′W 173°16.8499′W 173°22.8294′W 171°26.9395′W 171°27.0753′W 171°52.8396′W 168°38.2587′W 168°38.2587′W
Water depth (mbsl) 1957.6 1447.0 1559.0 1258.0 1258.0 1503.3 1262.0 1262.0
Hole total depth (mbsf) 232.9 65.7 522.0 11.5 8.5 182.8 53.3 37.0
Time on hole (h) 227.00 115.75 435.25 19.00 15.25 191.00 12.50 57.50
Number of cores 38 13 73 2 1 23 6 5
Cored interval (m) 232.9 65.7 522.0 11.5 8.5 182.8 53.3 37.0
Recovered core (m) 139.70 47.22 458.16 1.50 0.57 136.17 8.76 14.47
Average recovery (%) 60.0 71.9 87.8 13.0 6.7 74.5 16.4 39.1
Igneous basement depth (mbsf) 45.6 33.9 16.7 NA NA 41.9 15.1 9.1
Igneous basement cored (m) 187.3 31.8 505.3 NA NA 140.9 38.2 27.9
Average basement recovery (%) 55.8 90.6 88.0 NA NA 75.6 28.1 48.0
Average basement penetration rate (m/h) 2.2 0.9 2.5 NA NA 1.8 2.3 1.8

Note: NA = not applicable.

Previous   |   Close    |   Top of page