Table T11. Logging operations, Hole U1316A.

Date
(May 2005)
Local time
(h)
Comments
1 2300 Hole preparation complete, rig up short version of triple combo (HNGS-APS-HLDS)
2 0100 Run into hole with short version of triple combo
2 0230 Encountered obstruction 15 m below pipe
2 Start pumping and pulling up and down (10 m) the pipe without success
2 Abort logging operation in Hole U1316A
2 0430 Pull tools out of hole and rig down
2 0530 End of logging operation

Notes: Drillers total depth = 1093 mbrf, water depth = 948 m, end of pipe = 30 mbsf, total depth = 134 mbsf. Triple combo = triple combination, HNGS = Hostile Environment Natural Gamma Ray Sonde, APS = Accelerator Porosity Sonde, HLDS = Hostile Environment Litho-Density Sonde.