Table T12. Logging operations, Hole U1316C.
Date (May 2005) |
Local time (h) |
Comments |
---|---|---|
8 | 0300 | Hole preparation complete, rig up triple combo (HNGS-APS-HLDS-DIT) |
8 | 0515 | Run into hole with triple combo |
8 | 0635 | Uplog with triple combo at 900 ft/h from total depth |
8 | 0715 | Pull tools out of hole and rig down |
8 | 0815 | Rig up FMS-sonic (SGT-DSI-GPIT-FMS) |
8 | 0900 | Run into hole with FMS-sonic |
8 | 1030 | First pass with FMS-sonic at 900 ft/h from total depth |
8 | 1050 | Going down for main pass |
8 | 1105 | Uplog with FMS-sonic at 900 ft/h from total depth |
8 | 1135 | Pull tools out of hole and rig down |
8 | 1215 | Clear rig floor of logging tools, sheaves, and wireline |
8 | 1330 | End of logging operation |
Notes: Drillers total depth = 1098 mbrf, water depth = 943 m, end of pipe = 57 mbsf, total depth = 143 mbsf. Triple combo = triple combination, HNGS = Hostile Environment Natural Gamma Ray Sonde, APS = Accelerator Porosity Sonde; HLDS = Hostile Environment Litho-Density Sonde, DIT = Dual Induction Tool, SGT = Scintillation Gamma Ray Tool, DSI = Dipole Sonic Imager, GPIT = General Purpose Inclinometry Tool, FMS = Formation MicroScanner.