Previous   |    Close   |    Next

Table T14. Downhole tool deployment, Site U1319.

Hole Tool Deployment Depth Date
(2005)
Time in
formation
(min)
(mbsf) (mbsl)
308-
U1319A T2P 1 –41.6 1388.0 6 June 5
U1319A APCT 1 42.5 1471.7 7 June 10
U1319A T2P 2 80.5 1509.7 7 June 35

Note: T2P = temperature/​dual pressure probe, APCT = advanced piston corer temperature tool.

Previous   |    Close   |    Next   |    Top of page