Table T14. Downhole tool deployment, Site U1319.
Hole | Tool | Deployment | Depth | Date (2005) |
Time in formation (min) |
|
---|---|---|---|---|---|---|
(mbsf) | (mbsl) | |||||
308- | ||||||
U1319A | T2P | 1 | –41.6 | 1388.0 | 6 June | 5 |
U1319A | APCT | 1 | 42.5 | 1471.7 | 7 June | 10 |
U1319A | T2P | 2 | 80.5 | 1509.7 | 7 June | 35 |
Note: T2P = temperature/dual pressure probe, APCT = advanced piston corer temperature tool.
Previous | Close | Next | Top of page