Table T15. T2P Deployment 1, Hole U1319A.

Event Time
(CDT)
Description
1 18:31:00 Data logger started at 1 Hz
2 20:46:00 T2P on rig floor
3 21:10:00 T2P raised vertically
4 21:10:20 Pressure response chamber removed from T2P tip
5 21:10:20 Shroud in place over T2P tip
6 21:11:19 T2P placed in drill pipe
7 21:13:00 T2P connected to spacer
8 21:16:16 CDS connected to spacer
9 21:16:43 CDS in extended position
10 21:20:05 Start lowering T2P downhole
11 21:32:35 Stop at 511 mbsl
12 21:35:00 Start lowering probe
13 21:41:27 Stop at 1011 mbsl
14 21:44:00 Start lowering probe
15 21:55:33 Stop at 1388 mbsl
16 22:01:30 Start pulling T2P uphole
17 22:16:59 Stop at 1010 mbsl
18 22:19:02 Continue pulling T2P uphole
19 22:23:05 Stop at 511 mbsl
20 22:25:09 Continue pulling T2P uphole
21 22:41:40 T2P on rig floor
22 22:41:52 T2P tip in pressure response chamber
23 22:46:46 Pressure response test
24 22:58:00 Data downloaded from data logger
25 23:40:00 Battery removed from T2P

Notes: Date = 6 June 2005. Depth = 1388 mbsl. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. CDT = central daylight time.