Previous   |    Close

Table T16. T2P Deployment 2, Hole U1319A.

Event Time
(CDT)
Description
1 01:07:50 Data logger started at 1 Hz
2 08:13:28 T2P on rig floor
3 08:15:48 T2P raised vertically
4 08:16:10 Pressure response chamber removed from T2P tip
5 08:16:10 Shroud in place over T2P tip
6 08:19:38 T2P placed in drill pipe
7 08:20:11 T2P connected to spacer
8 08:23:54 CDS connected to spacer
9 08:25:15 CDS in extended position
10 08:26:52 Start lowering T2P downhole, pumps on
11 08:35:03 Stop at 511 mbsl, pumps off
12 08:37:20 Start lowering probe, pumps on
13 08:44:25 Stop at 1012 mbsl, pumps off
14 08:46:30 Start lowering probe, pumps on
15 08:52:39 Stop at 1431 mbsl, pumps off
16 08:55:05 Start lowering probe
17 08:58:20 T2P passes through lockable float valve
18 09:05:45 CDS lands in BHA
19 09:08:52 Start penetration of T2P into sediment
20 09:15:29 End of T2P penetration
21 09:27:03 Pumps on at 10 spm
22 09:47:30 Start pulling T2P uphole
23 09:48:50 Stop pulling at 1509 mbsl
24 09:49:30 Pulling/releasing winch to free CDS from BHA
25 09:52:20 Start pulling T2P uphole
26 10:09:04 Stop at 511 mbsl, pumps off
27 10:11:30 Start pulling T2P uphole
28 10:20:59 CDS detached from wireline
29 10:27:50 CDS detached from spacer
30 10:30:16 Spacer detached from T2P
31 10:30:50 T2P on rig floor
32 10:31:16 T2P tip in pressure response chamber
33 10:39:00 T2P in workroom
34 10:49:00 Battery removed from T2P
35 11:04:38 T2P connected to direct-current power
36 11:05:00 Data downloaded from data logger

Notes: Date = 7 June 2005. Depth = 81.37 mbsf. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. spm = strokes per minute. CDT = central daylight time.

Previous   |    Close   |    Top of page