Table T16. T2P Deployment 2, Hole U1319A.
Event | Time (CDT) |
Description |
---|---|---|
1 | 01:07:50 | Data logger started at 1 Hz |
2 | 08:13:28 | T2P on rig floor |
3 | 08:15:48 | T2P raised vertically |
4 | 08:16:10 | Pressure response chamber removed from T2P tip |
5 | 08:16:10 | Shroud in place over T2P tip |
6 | 08:19:38 | T2P placed in drill pipe |
7 | 08:20:11 | T2P connected to spacer |
8 | 08:23:54 | CDS connected to spacer |
9 | 08:25:15 | CDS in extended position |
10 | 08:26:52 | Start lowering T2P downhole, pumps on |
11 | 08:35:03 | Stop at 511 mbsl, pumps off |
12 | 08:37:20 | Start lowering probe, pumps on |
13 | 08:44:25 | Stop at 1012 mbsl, pumps off |
14 | 08:46:30 | Start lowering probe, pumps on |
15 | 08:52:39 | Stop at 1431 mbsl, pumps off |
16 | 08:55:05 | Start lowering probe |
17 | 08:58:20 | T2P passes through lockable float valve |
18 | 09:05:45 | CDS lands in BHA |
19 | 09:08:52 | Start penetration of T2P into sediment |
20 | 09:15:29 | End of T2P penetration |
21 | 09:27:03 | Pumps on at 10 spm |
22 | 09:47:30 | Start pulling T2P uphole |
23 | 09:48:50 | Stop pulling at 1509 mbsl |
24 | 09:49:30 | Pulling/releasing winch to free CDS from BHA |
25 | 09:52:20 | Start pulling T2P uphole |
26 | 10:09:04 | Stop at 511 mbsl, pumps off |
27 | 10:11:30 | Start pulling T2P uphole |
28 | 10:20:59 | CDS detached from wireline |
29 | 10:27:50 | CDS detached from spacer |
30 | 10:30:16 | Spacer detached from T2P |
31 | 10:30:50 | T2P on rig floor |
32 | 10:31:16 | T2P tip in pressure response chamber |
33 | 10:39:00 | T2P in workroom |
34 | 10:49:00 | Battery removed from T2P |
35 | 11:04:38 | T2P connected to direct-current power |
36 | 11:05:00 | Data downloaded from data logger |
Notes: Date = 7 June 2005. Depth = 81.37 mbsf. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. spm = strokes per minute. CDT = central daylight time.