Previous   |    Close   |    Next

Table T14. Downhole tool deployment, Site U1320A.

Hole Tool Deployment Depth Date
(Jun 2005)
Time in
formation (min)
(mbsf) (mbsl)
308-
U1320A T2P 3 126.3 1596.3 8 45
U1320A DVTPP 1 203.4 1673.4 9 40
U1320A T2P 4 213.0 1683.0 9 25
U1320A DVTPP 2 289.9 1759.9 9 10

Note: T2P = temperature/dual pressure probe, DVTPP = Davis-Villinger Temperature-Pressure Probe.

Previous   |    Close   |    Next   |    Top of page