Table T14. Downhole tool deployment, Site U1320A.
Hole | Tool | Deployment | Depth | Date (Jun 2005) |
Time in formation (min) |
|
---|---|---|---|---|---|---|
(mbsf) | (mbsl) | |||||
308- | ||||||
U1320A | T2P | 3 | 126.3 | 1596.3 | 8 | 45 |
U1320A | DVTPP | 1 | 203.4 | 1673.4 | 9 | 40 |
U1320A | T2P | 4 | 213.0 | 1683.0 | 9 | 25 |
U1320A | DVTPP | 2 | 289.9 | 1759.9 | 9 | 10 |
Note: T2P = temperature/dual pressure probe, DVTPP = Davis-Villinger Temperature-Pressure Probe.
Previous | Close | Next | Top of page