Table T15. T2P Deployment 3, Hole U1320A.

Event Time
(CDT)
Event
1   Data logger started at 1 Hz
2 18:08:00 T2P on rig floor
3 18:14:00 Pressure response chamber removed from T2P tip
4 18:14:00 Shroud in place over T2P tip
5 18:15:00 T2P connected to spacer
6 18:17:00 CDS connected to spacer
7 18:22:00 CDS in connected to wireline
8 18:23:00 Start lowering T2P downhole, pumps on
9 18:30:00 Stop at 511 mbsl, pumps off
10 18:33:00 Start lowering probe, pumps on
11 18:40:00 Stop at 1011 mbsl, pumps off
12 18:43:00 Start lowering probe, pumps on
13 18:44:00 Pumping at 13 spm
14 18:50:00 Stop at 1490 mbsl, pumps off
15 18:53:00 Start lowering probe, pumps on at 13 spm
16 18:57:00 Pumps off
17 19:00:00 CDS lands in BHA
18 19:00:00 Raising BHA to 2 m off bottom of hole
19 19:02:00 Start penetration of T2P into sediment, 2 m advance of BHA
20 19:03:00 End of T2P penetration
21 19:04:00 Raising BHA 3 m off bottom of hole
22 19:07:00 Pumping at 10 spm
23 19:55:00 Pulling T2P uphole slowly 10 m
24 19:59:00 10 m pull completed
25 19:59:00 Start pulling T2P uphole, pumping at 10 spm
26 20:05:00 Stop at 511 mbsl, pumps off
27 20:09:00 Start pulling T2P uphole, pumps on
28 20:13:00 CDS detached from wireline
29 20:16:00 CDS detached from spacer
30 20:18:00 Spacer detached from T2P
31 20:18:00 T2P on rig floor
32 20:18:00 T2P tip in pressure response chamber
33 20:26:00 T2P in workroom
34 20:46:00 Battery removed from T2P
35 20:46:00 T2P connected to direct-current power
    Data downloaded from data logger

Notes: Date = 8 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.