Table T16. T2P Deployment 4, Hole 1320A.

Event Time
(CDT)
Event
1   Data logger started at 1 Hz
2 6:24:00 T2P on rig floor
3 6:29:00 Pressure response chamber removed from T2P tip
4 6:29:00 Shroud in place over T2P tip
5 6:31:00 T2P in drill pipe
6 6:32:00 T2P connected to spacer
7 6:34:00 CDS connected to spacer
8 6:37:00 CDS in connected to wireline
9 6:39:00 Start lowering T2P downhole, pumps on
10 6:44:00 Stop at 511 mbsl, pumps off
11 6:46:00 Start lowering probe, pumps on
12 6:52:00 Stop at 1011 mbsl, pumps off
13 6:54:00 Start lowering probe, pumps on
14 7:00:00 Stop at 1471 mbsl, pumps off
15 7:03:00 Drill bit positioned 0.5ñ0.75 m off bottom of hole
16 7:12:00 CDS lands in BHA, probe in formation
17 7:12:00 Raising BHA 2.5 m
18 7:17:00 Pumping at 10 spm
19 7:36:00 Pulling T2P uphole to disengage CDS
20 7:37:00 Pulling T2P uphole
21 7:51:00 T2P tip at 372 mbsl
22 7:54:00 T2P lowered to 511 mbsl, pumps off
23 7:56:00 Pulling T2P uphole
24 8:05:00 CDS lowered to retracted position
25 8:08:00 CDS detached from spacer
26 8:09:00 T2P detached from spacer
27 8:09:00 T2P tip in pressure response chamber
28 8:16:00 T2P in workroom
29   Battery removed from T2P
30   T2P connected to direct-current power
31   Data downloaded from data logger

Notes: Date = 9 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.