Table T19. T2P Deployment 20, Hole U1322B.

Event Time
(GMT)
Description
1   Data logger started at 1 Hz
2 18:15:52 T2P on rig floor
3 18:38:28 Start lowering T2P downhole, pumps on
4 18:46:30 Stop at 491 mbsl, pumps off
5 18:49:40 Start lowering probe
6 18:54:04 Stop at 741 mbsl, pumps off
7 18:57:00 Start lowering probe
8 19:05:42 Stop at 1321 mbsl, pumps off
9 19:08:33 Start lowering probe
10 19:13:48 Stop at 1467 mbsl, pumps off
11 19:19:02 Start lowering probe
12 19:36:51 CDS lands in BHA; pumps off
13 19:36:52 Start penetration of T2P into sediment
14 19:37:39 End of T2P penetration; bit on bottom of hole
15 19:37:50 Raising BHA 4.0 m off bottom of hole
16 20:43:13 Pulling T2P uphole slowly with wireline
17 21:10:30 Wireline disconnected from CDS
18 21:13:15 CDS disconnected from spacer
19 21:14:30 Spacer disconnected from CDS
20 22:15:00 T2P out of pipe
21   Data downloaded from data logger

Notes: Depth = 157.8 mbsf. Date = 29 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.