Previous   |    Close   |    Next

Table T20. T2P Deployment 21, Hole U1322C.

Event Time
(GMT)
Description
1 17:16:36 Data logger started at 1 Hz
2 18:53:12 Start lowering T2P downhole, pumps on
3 18:59:12 Stop at 491 mbsl, pumps off
4 19:01:57 Start lowering probe
5 19:06:02 Stop at 741 mbsl, pumps off
6 19:08:10 Start lowering probe
7 19:15:34 Stop at 1321 mbsl, pumps off
8 19:17:39 Start lowering probe
9 19:21:57 Stop at 1359 mbsl, pumps off
10 19:23:32 Start lowering probe
11 19:28:12 CDS lands in BHA; pumps off
12 19:28:30 Start penetration of T2P into sediment
13 19:30:07 End of T2P penetration; bit on bottom of hole
14 19:30:14 Raising BHA 4.0 m off bottom of hole
15 20:33:35 Pulling T2P uphole slowly with wireline
16 20:35:24 Stop at 1321 mbsl, pumps off
17 20:37:37 Pulling T2P uphole slowly with wireline
18 20:43:30 Stop at 741 mbsl, pumps off
19 20:45:47 Pulling T2P uphole slowly with wireline
20 20:48:59 Stop at 491 mbsl, pumps off
21 20:51:12 Pulling T2P uphole slowly with wireline
22 20:56:27 Wireline disconnected from CDS
23 20:59:15 CDS/spacer disconnected from spacer
24 21:05:00 T2P out of pipe
25 21:15:00 Data downloaded from data logger

Notes: Depth = 50.0 mbsf. Date = 30 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly.

Previous   |    Close   |    Next   |    Top of page