Previous   |    Close   |    Next

Table T16. Downhole tool deployment, Site U1324.

Hole Tool Deployment Depth Date
(Jun 2005)
Time in
formation
(min)
(mbsf) (mbsl)
308-
U1324B T2P 5 51.3 1108.1 21 30
U1324B T2P 6 89.3 1146.1 21 30
U1324B T2P 7 117.8 1174.6 21 40
U1324B T2P 8 136.3 1193.1 21 30
U1324B T2P 9 368.0 1424.8 23 40
U1324B T2P 10 394.5 1451.3 23 30
U1324B T2P 11 593.2 1650.0 25 15
U1324C T2P 12 50.0 1105.7 26 60
U1324C T2P 13 100.0 1155.7 26 60
U1324C T2P 14 150.0 1205.7 26 60
U1324C T2P 15 200.0 1255.7 27 60
U1324C T2P 16 300.0 1355.7 27 90
U1324B DVTPP 3 229.1 1285.9 22 40
U1324B DVTPP 4 362.4 1419.2 23 40
U1324B DVTPP 5 387.9 1444.7 23 10
U1324B DVTPP 6 464.3 1521.1 24 30
U1324B DVTPP 7 493.1 1549.9 24 30
U1324B DVTPP 8 521.9 1578.7 24 25
U1324B DVTPP 9 541.1 1597.9 25 30
U1324B DVTPP 10 560.4 1617.2 25 30
U1324B DVTPP 11 589.2 1646.0 25 45
U1324B DVTPP 12 608.2 1665.0 25 60
U1324C DVTPP 13 250.0 1305.7 27 90
U1324C DVTPP 14 405.0 1460.7 27 90
U1324C DVTPP 15 505.0 1560.7 28 90
U1324B APCT 2 51.3 1108.1 21 10
U1324B APCT 3 79.8 1136.6 21 10
U1324B APCT 4 108.3 1165.1 21 10
U1324B APCT 5 136.3 1193.1 21 10

Note: T2P = temperature/​dual pressure probe, DVTPP = Davis-Villinger Temperature-Pressure Probe, APCT = advanced piston corer temperature tool.

Previous   |    Close   |    Next   |    Top of page