Table T17. Event summary of T2P Deployment 5, Hole U1324B.
Event | Time (CDT) |
Event |
---|---|---|
1 | Data logger started at 1 Hz | |
2 | 0640 | T2P on rig floor |
3 | 0647 | Pressure response chamber removed from T2P tip |
4 | 0647 | Shroud in place over T2P tip |
5 | 0648 | T2P connected to spacer |
6 | 0650 | CDS connected to spacer |
7 | 0655 | Start lowering T2P downhole, pumps on |
8 | 0704 | Stop at 515 mbsl, pumps off |
9 | 0708 | Start lowering probe, pumps on |
10 | 0712 | Stop at 768 mbsl, pumps off |
11 | 0714 | Start lowering probe, pumps on |
12 | 0719 | Stop at 1066 mbsl, pumps off |
13 | 0722 | Start lowering probe, pumps on at 18 spm |
14 | 0723 | Bit is 0.5 m off BOH |
15 | 0724 | Start lowering probe to land in BHA |
16 | 0725 | CDS lands in BHA; pumps off |
17 | 0725 | Raising BHA to 2 m off BOH |
18 | 0726 | Start penetration of T2P into sediment, 2 m advance of BHA |
19 | 0727 | End of T2P penetration; bit 0.25 m off bottom of hole |
20 | 0727 | Raising BHA 2 m off bottom of hole |
21 | 0732 | Pumping at 11 spm |
22 | 0757 | Pulling T2P uphole slowly with wireline |
23 | 0758 | CDS clear of BHA |
24 | 0800 | Stop at 1067 mbsl, pumps off |
25 | 0804 | Pulling T2P uphole slowly with wireline |
26 | 0809 | Stop at 767 mbsl, pumps off |
27 | 0811 | Pulling T2P uphole slowly with wireline |
28 | 0815 | Stop at 516 mbsl, pumps off |
29 | 0817 | Pulling T2P uphole slowly with wireline |
30 | 0825 | Wireline disconnected from CDS |
31 | 0825 | CDS extended |
32 | 0828 | CDS disconnected from spacer |
33 | 0828 | Spacer disconnected from CDS |
34 | 0830 | T2P disconnected from spacer |
35 | 0833 | T2P out of pipe |
36 | Data downloaded from data logger |
Notes: Depth = 51.3 mbsf. Date = 21 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time. SPM = strokes per minute. BOH = bottom of hole.