Table T17. Event summary of T2P Deployment 5, Hole U1324B.

Event Time
(CDT)
Event
1   Data logger started at 1 Hz
2 0640 T2P on rig floor
3 0647 Pressure response chamber removed from T2P tip
4 0647 Shroud in place over T2P tip
5 0648 T2P connected to spacer
6 0650 CDS connected to spacer
7 0655 Start lowering T2P downhole, pumps on
8 0704 Stop at 515 mbsl, pumps off
9 0708 Start lowering probe, pumps on
10 0712 Stop at 768 mbsl, pumps off
11 0714 Start lowering probe, pumps on
12 0719 Stop at 1066 mbsl, pumps off
13 0722 Start lowering probe, pumps on at 18 spm
14 0723 Bit is 0.5 m off BOH
15 0724 Start lowering probe to land in BHA
16 0725 CDS lands in BHA; pumps off
17 0725 Raising BHA to 2 m off BOH
18 0726 Start penetration of T2P into sediment, 2 m advance of BHA
19 0727 End of T2P penetration; bit 0.25 m off bottom of hole
20 0727 Raising BHA 2 m off bottom of hole
21 0732 Pumping at 11 spm
22 0757 Pulling T2P uphole slowly with wireline
23 0758 CDS clear of BHA
24 0800 Stop at 1067 mbsl, pumps off
25 0804 Pulling T2P uphole slowly with wireline
26 0809 Stop at 767 mbsl, pumps off
27 0811 Pulling T2P uphole slowly with wireline
28 0815 Stop at 516 mbsl, pumps off
29 0817 Pulling T2P uphole slowly with wireline
30 0825 Wireline disconnected from CDS
31 0825 CDS extended
32 0828 CDS disconnected from spacer
33 0828 Spacer disconnected from CDS
34 0830 T2P disconnected from spacer
35 0833 T2P out of pipe
36   Data downloaded from data logger

Notes: Depth = 51.3 mbsf. Date = 21 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time. SPM = strokes per minute. BOH = bottom of hole.