Table T18. Event summary of T2P Deployment 6, Hole U1324B.

Event Time
(CDT)
Event
1 09:17:00 Data logger started at 1 Hz
2 11:15:19 T2P on rig floor
3 11:47:09 Start lowering T2P downhole, pumps on
4 11:56:03 Stop at 511 mbsl, pumps off
5 11:57:57 Start lowering probe, pumps on
6 12:03:05 Stop at 761 mbsl, pumps off
7 12:04:57 Start lowering probe, pumps on
8 12:10:14 Stop at 1058 mbsl, pumps off
9 12:16:30 Start lowering probe
10 12:18:50 Stop at 1135 mbsl, pumps off
11 12:20:54 Start lowering probe to land in BHA
12 12:22:56 CDS lands in BHA; pumps off
13 12:31:02 Start penetration of T2P into sediment
14 12:33:43 End of T2P penetration; bit 1 m off bottom of hole
15 12:36:02 Raising BHA 2 m off bottom of hole
16 12:42:09 Pumping at 11 spm
17 13:08:17 Pulling T2P uphole slowly with wireline
18 13:11:30 CDS clear of BHA
19 13:13:40 Stop at 1058 mbsl, pumps off
20 13:15:47 Pulling T2P uphole slowly with wireline
21 13:18:55 Stop at 760 mbsl, pumps off
22 13:20:52 Pulling T2P uphole slowly with wireline
23 13:23:50 Stop at 511 mbsl, pumps off
24 13:25:46 Pulling T2P uphole slowly with wireline
25 13:31:24 Wireline disconnected from CDS
26 13:32:30 CDS retracted
27 13:35:22 CDS disconnected from spacer
28 13:37:31 Spacer disconnected from CDS
29 13:38:23 T2P out of pipe
30 13:50:30 Data downloaded from data logger

Notes: Depth = 89.3 mbsf. Date = 21 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time. SPM = strokes per minute.