Table T18. Event summary of T2P Deployment 6, Hole U1324B.
Event | Time (CDT) |
Event |
---|---|---|
1 | 09:17:00 | Data logger started at 1 Hz |
2 | 11:15:19 | T2P on rig floor |
3 | 11:47:09 | Start lowering T2P downhole, pumps on |
4 | 11:56:03 | Stop at 511 mbsl, pumps off |
5 | 11:57:57 | Start lowering probe, pumps on |
6 | 12:03:05 | Stop at 761 mbsl, pumps off |
7 | 12:04:57 | Start lowering probe, pumps on |
8 | 12:10:14 | Stop at 1058 mbsl, pumps off |
9 | 12:16:30 | Start lowering probe |
10 | 12:18:50 | Stop at 1135 mbsl, pumps off |
11 | 12:20:54 | Start lowering probe to land in BHA |
12 | 12:22:56 | CDS lands in BHA; pumps off |
13 | 12:31:02 | Start penetration of T2P into sediment |
14 | 12:33:43 | End of T2P penetration; bit 1 m off bottom of hole |
15 | 12:36:02 | Raising BHA 2 m off bottom of hole |
16 | 12:42:09 | Pumping at 11 spm |
17 | 13:08:17 | Pulling T2P uphole slowly with wireline |
18 | 13:11:30 | CDS clear of BHA |
19 | 13:13:40 | Stop at 1058 mbsl, pumps off |
20 | 13:15:47 | Pulling T2P uphole slowly with wireline |
21 | 13:18:55 | Stop at 760 mbsl, pumps off |
22 | 13:20:52 | Pulling T2P uphole slowly with wireline |
23 | 13:23:50 | Stop at 511 mbsl, pumps off |
24 | 13:25:46 | Pulling T2P uphole slowly with wireline |
25 | 13:31:24 | Wireline disconnected from CDS |
26 | 13:32:30 | CDS retracted |
27 | 13:35:22 | CDS disconnected from spacer |
28 | 13:37:31 | Spacer disconnected from CDS |
29 | 13:38:23 | T2P out of pipe |
30 | 13:50:30 | Data downloaded from data logger |
Notes: Depth = 89.3 mbsf. Date = 21 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time. SPM = strokes per minute.