Table T19. Event summary of T2P Deployment 7, Hole U1324B.
Event | Time (CDT) |
Event |
---|---|---|
1 | 15:18:00 | Data logger started at 1 Hz |
2 | 15:56:13 | T2P on rig floor |
3 | 16:07:34 | Start lowering T2P downhole, pumps on |
4 | 16:15:37 | Stop at 511 mbsl, pumps off |
5 | 16:17:21 | Start lowering probe, pumps on |
6 | 16:20:55 | Stop at 761 mbsl, pumps off |
7 | 16:22:48 | Start lowering probe, pumps on |
8 | 16:26:40 | Stop at 1058 mbsl, pumps off |
9 | 16:30:00 | Start lowering probe |
10 | 16:33:23 | Stop at 1164 mbsl, pumps off |
11 | 16:40:04 | Start lowering probe to land in BHA |
12 | 16:44:27 | CDS lands in BHA; pumps off |
13 | 16:47:23 | Start penetration of T2P into sediment |
14 | 16:48:41 | End of T2P penetration; bit 1 m off bottom of hole |
15 | 16:52:24 | Raising BHA 2 m off bottom of hole |
16 | 16:58:15 | Pumping at 14 spm |
17 | 17:28:50 | Pulling T2P uphole slowly with wireline |
18 | 17:33:15 | CDS clear of BHA |
19 | 17:34:00 | Stop at 1058 mbsl, pumps off |
20 | 17:36:23 | Pulling T2P uphole slowly with wireline |
21 | 17:40:42 | Stop at 760 mbsl, pumps off |
22 | 17:42:49 | Pulling T2P uphole slowly with wireline |
23 | 17:46:02 | Stop at 511 mbsl, pumps off |
24 | 17:48:12 | Pulling T2P uphole slowly with wireline |
25 | 17:55:35 | Wireline disconnected from CDS |
26 | 17:56:39 | CDS retracted |
27 | 17:58:10 | CDS disconnected from spacer |
28 | 17:59:55 | Spacer disconnected from CDS |
29 | 18:01:00 | T2P out of pipe |
30 | 18:08:18 | Data downloaded from data logger |
Notes: Depth = 117.8 mbsf. Date = 21 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time. STM = strokes per minute.