Previous   |    Close   |    Next

Table T19. Event summary of T2P Deployment 7, Hole U1324B.

Event Time
(CDT)
Event
1 15:18:00 Data logger started at 1 Hz
2 15:56:13 T2P on rig floor
3 16:07:34 Start lowering T2P downhole, pumps on
4 16:15:37 Stop at 511 mbsl, pumps off
5 16:17:21 Start lowering probe, pumps on
6 16:20:55 Stop at 761 mbsl, pumps off
7 16:22:48 Start lowering probe, pumps on
8 16:26:40 Stop at 1058 mbsl, pumps off
9 16:30:00 Start lowering probe
10 16:33:23 Stop at 1164 mbsl, pumps off
11 16:40:04 Start lowering probe to land in BHA
12 16:44:27 CDS lands in BHA; pumps off
13 16:47:23 Start penetration of T2P into sediment
14 16:48:41 End of T2P penetration; bit 1 m off bottom of hole
15 16:52:24 Raising BHA 2 m off bottom of hole
16 16:58:15 Pumping at 14 spm
17 17:28:50 Pulling T2P uphole slowly with wireline
18 17:33:15 CDS clear of BHA
19 17:34:00 Stop at 1058 mbsl, pumps off
20 17:36:23 Pulling T2P uphole slowly with wireline
21 17:40:42 Stop at 760 mbsl, pumps off
22 17:42:49 Pulling T2P uphole slowly with wireline
23 17:46:02 Stop at 511 mbsl, pumps off
24 17:48:12 Pulling T2P uphole slowly with wireline
25 17:55:35 Wireline disconnected from CDS
26 17:56:39 CDS retracted
27 17:58:10 CDS disconnected from spacer
28 17:59:55 Spacer disconnected from CDS
29 18:01:00 T2P out of pipe
30 18:08:18 Data downloaded from data logger

Notes: Depth = 117.8 mbsf. Date = 21 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time. STM = strokes per minute.

Previous   |    Close   |    Next   |    Top of page