1 19:28:15 Data logger started at 1 Hz
2 20:45:41 T2P on rig floor
3 20:58:19 Start lowering T2P downhole, pumps on
4 21:08:05 Stop at 511 mbsl, pumps off
5 21:10:10 Start lowering probe, pumps on
6 21:14:29 Stop at 761 mbsl, pumps off
7 21:17:00 Start lowering probe, pumps on
8 21:21:21 Stop at 1058 mbsl, pumps off
9 21:23:35 Start lowering probe
10 21:27:07 Stop at 1151 mbsl, pumps off
11 21:32:50 Start lowering probe
12 21:34:35 Stop at 1181 mbsl, pumps off
13 21:38:25 Start lowering probe
14 21:43:12 CDS lands in BHA; pumps off
15 21:43:58 Start penetration of T2P into sediment
16 21:44:49 End of T2P penetration; bit at bottom of hole
17 21:45:21 Raising BHA 1.5 m off bottom of hole
18 22:16:41 Pulling T2P uphole slowly with wireline
19 22:18:30 CDS clear of BHA
20 22:20:50 Stop at 1058 mbsl, pumps off
21 22:23:50 Pulling T2P uphole slowly with wireline
22 22:27:26 Stop at 761 mbsl, pumps off
23 22:30:25 Pulling T2P uphole slowly with wireline
24 22:33:40 Stop at 511 mbsl, pumps off
25 22:36:00 Pulling T2P uphole slowly with wireline
26 22:42:35 Wireline disconnected from CDS
27 22:45:08 CDS disconnected from spacer
28 22:46:30 Spacer disconnected from CDS
29 22:47:15 T2P out of pipe
30 23:11:00 Data downloaded from data logger