Previous   |    Close   |    Next

Table T21. Event summary of T2P Deployment 9, Hole U1324B.

Event Time
(CDT)
Event
1 08:28:29 Data logger started at 1 Hz
2 09:57:35 T2P on rig floor
3 10:11:43 Start lowering T2P downhole, pumps on
4 10:28:24 Stop at 1058 mbsl, pumps off
5 10:33:36 Start lowering probe
6 10:45:14 Stop at 1432 mbsl, pumps off
7 10:49:43 Start lowering probe
8 10:53:27 CDS lands in BHA; pumps off
9 10:54:10 Start penetration of T2P into sediment
10 10:58:39 End of T2P penetration; bit at bottom of hole
11 10:59:31 Raising BHA 2 m off bottom of hole
12 11:40:15 Pulling T2P uphole slowly with wireline
13 11:48:13 Stop at 1058 mbsl, pumps off
14 11:51:35 Pulling T2P uphole slowly with wireline
15 12:01:39 Wireline disconnected from CDS
16 12:04:35 CDS disconnected from spacer
17 12:06:10 Spacer disconnected from CDS
18 12:08:23 T2P out of pipe
19 12:30:00 Data downloaded from data logger

Notes: Depth = 368.0 mbsf. Date = 23 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time.

Previous   |    Close   |    Next   |    Top of page