Table T21. Event summary of T2P Deployment 9, Hole U1324B.
Event | Time (CDT) |
Event |
---|---|---|
1 | 08:28:29 | Data logger started at 1 Hz |
2 | 09:57:35 | T2P on rig floor |
3 | 10:11:43 | Start lowering T2P downhole, pumps on |
4 | 10:28:24 | Stop at 1058 mbsl, pumps off |
5 | 10:33:36 | Start lowering probe |
6 | 10:45:14 | Stop at 1432 mbsl, pumps off |
7 | 10:49:43 | Start lowering probe |
8 | 10:53:27 | CDS lands in BHA; pumps off |
9 | 10:54:10 | Start penetration of T2P into sediment |
10 | 10:58:39 | End of T2P penetration; bit at bottom of hole |
11 | 10:59:31 | Raising BHA 2 m off bottom of hole |
12 | 11:40:15 | Pulling T2P uphole slowly with wireline |
13 | 11:48:13 | Stop at 1058 mbsl, pumps off |
14 | 11:51:35 | Pulling T2P uphole slowly with wireline |
15 | 12:01:39 | Wireline disconnected from CDS |
16 | 12:04:35 | CDS disconnected from spacer |
17 | 12:06:10 | Spacer disconnected from CDS |
18 | 12:08:23 | T2P out of pipe |
19 | 12:30:00 | Data downloaded from data logger |
Notes: Depth = 368.0 mbsf. Date = 23 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time.
Previous | Close | Next | Top of page