Table T22. Event summary of T2P Deployment 10, Hole U1324B.

Event Time
(CDT)
Event
1 16:36:20 Data logger started at 1 Hz
2 17:26:10 T2P on rig floor
3 17:57:34 Start lowering T2P downhole, pumps on
4 18:10:58 Stop at 1058 mbsl, pumps off
5 18:14:18 Start lowering probe
6 18:24:55 CDS lands in BHA; pumps off
7 18:27:03 Start penetration of T2P into sediment
8 18:31:25 End of T2P penetration; bit at bottom of hole
9 18:33:20 Raising BHA 2.5 m off bottom of hole
10 19:06:01 Pulling T2P uphole slowly with wireline
11 19:13:40 Stop at 1058 mbsl, pumps off
12 19:16:47 Pulling T2P uphole slowly with wireline
13 19:30:04 Wireline disconnected from CDS
14 19:37:00 CDS disconnected from spacer
15 19:39:21 Spacer disconnected from CDS
16 19:40:11 T2P out of pipe
17 19:59:59 Data downloaded from data logger

Notes: Depth = 394.5 mbsf. Date = 23 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time.