Table T22. Event summary of T2P Deployment 10, Hole U1324B.
Event | Time (CDT) |
Event |
---|---|---|
1 | 16:36:20 | Data logger started at 1 Hz |
2 | 17:26:10 | T2P on rig floor |
3 | 17:57:34 | Start lowering T2P downhole, pumps on |
4 | 18:10:58 | Stop at 1058 mbsl, pumps off |
5 | 18:14:18 | Start lowering probe |
6 | 18:24:55 | CDS lands in BHA; pumps off |
7 | 18:27:03 | Start penetration of T2P into sediment |
8 | 18:31:25 | End of T2P penetration; bit at bottom of hole |
9 | 18:33:20 | Raising BHA 2.5 m off bottom of hole |
10 | 19:06:01 | Pulling T2P uphole slowly with wireline |
11 | 19:13:40 | Stop at 1058 mbsl, pumps off |
12 | 19:16:47 | Pulling T2P uphole slowly with wireline |
13 | 19:30:04 | Wireline disconnected from CDS |
14 | 19:37:00 | CDS disconnected from spacer |
15 | 19:39:21 | Spacer disconnected from CDS |
16 | 19:40:11 | T2P out of pipe |
17 | 19:59:59 | Data downloaded from data logger |
Notes: Depth = 394.5 mbsf. Date = 23 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. CDT = central daylight time.