Table T23. Event summary of T2P Deployment 11, Hole U1324B.

Event Time
(GMT)
Event
1 12:02:00 Data logger started at 1 Hz
2 12:18:13 T2P on rig floor
3 12:31:55 Start lowering T2P downhole, pumps on
4 12:42:00 Stop at 1068 mbsl, pumps off
5 12:45:46 Start lowering probe
6 12:50:23 Stop at 1510 mbsl, pumps off
7 12:56:38 Start lowering probe
8 12:58:11 CDS lands in BHA; pumps off
9 13:14:02 Pulling T2P uphole slowly with wireline
10 13:25:02 Stop at 1067 mbsl, pumps off
11 13:28:02 Pulling T2P uphole slowly with wireline
12 13:34:27 Wireline disconnected from CDS
13 13:38:21 CDS disconnected from spacer
14 13:40:15 Spacer disconnected from CDS
15 13:46:40 T2P out of pipe
16 14:10:36 Data downloaded from data logger

Notes: Depth = 593.2 mbsf. Date = 25 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.