Table T24. Event summary of T2P Deployment 12, Hole U1324C.
Event | Time (GMT) |
Event |
---|---|---|
1 | Data logger started at 1 Hz | |
2 | 10:44:26 | T2P on rig floor |
3 | 10:52:56 | Start lowering T2P downhole, pumps on |
4 | 11:09:00 | Stop at 491 mbsl, pumps off |
5 | 11:11:37 | Start lowering probe |
6 | 11:14:13 | Stop at 741 mbsl, pumps off |
7 | 11:19:00 | Stop at 1057 mbsl, pumps off |
8 | 11:22:09 | Stop at 1095 mbsl, pumps off |
9 | 11:28:08 | Start lowering probe |
10 | 11:29:20 | CDS lands in BHA; pumps off |
11 | 11:32:50 | Start penetration of T2P into sediment |
12 | 11:40:35 | End of T2P penetration; bit on bottom of hole |
13 | 11:40:36 | Raising BHA 4.5 m off bottom of hole |
14 | 12:41:05 | Pulling T2P uphole slowly with wireline |
15 | 12:44:52 | Stop at 1057 mbsl, pumps off |
16 | 12:48:00 | Pulling T2P uphole slowly with wireline |
17 | 12:54:09 | Stop at 741 mbsl, pumps off |
18 | 12:56:09 | Pulling T2P uphole slowly with wireline |
19 | 13:00:57 | Stop at 491 mbsl, pumps off |
20 | 13:02:57 | Pulling T2P uphole slowly with wireline |
21 | Data downloaded from data logger |
Notes: Depth = 50.0 mbsf. Date = 26 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.
Previous | Close | Next | Top of page