Previous   |    Close   |    Next

Table T25. Event summary of T2P Deployment 13, Hole U1324C.

Event Time
(GMT)
Event
1 14:42:47 Data logger started at 1 Hz
2 16:18:30 T2P on rig floor
3 16:28:42 Start lowering T2P downhole, pumps on
4 16:44:22 Stop at 741 mbsl, pumps off
5 16:46:30 Start lowering probe
6 16:52:33 Stop at 1057 mbsl, pumps off
7 16:54:39 Start lowering probe
8 17:03:38 CDS lands in BHA; pumps off
9 17:04:34 Start penetration of T2P into sediment
10 17:05:22 End of T2P penetration; bit 1 m off bottom of hole
11 17:06:00 Raising BHA 2 m off bottom of hole
12 18:08:10 Pulling T2P uphole slowly with wireline
13 18:11:22 Stop at 1057 mbsl, pumps off
14 18:13:30 Pulling T2P uphole slowly with wireline
15 18:17:18 Stop at 741 mbsl, pumps off
16 18:19:36 Pulling T2P uphole slowly with wireline
17 18:22:53 Stop at 491 mbsl, pumps off
18 18:24:29 Pulling T2P uphole slowly with wireline
19 18:30:32 Wireline disconnected from CDS
20 18:34:39 CDS disconnected from spacer
21 18:36:28 Spacer disconnected from CDS
22 18:36:28 T2P out of pipe
23   Data downloaded from data logger

Notes: Depth = 100.0 mbsf. Date = 26 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.

Previous   |    Close   |    Next   |    Top of page