Table T26. Event summary of T2P Deployment 14, Hole U1324C.
Event | Time (GMT) |
Event |
---|---|---|
1 | Data logger started at 1 Hz | |
2 | 21:28:16 | Stop at 491 mbsl, pumps off |
3 | 21:30:16 | Start lowering probe |
4 | 21:35:17 | Stop at 741 mbsl, pumps off |
5 | 21:37:29 | Start lowering probe |
6 | 21:43:36 | Stop at 1057 mbsl, pumps off |
7 | 21:45:49 | Start lowering probe |
8 | 21:49:31 | Stop at 1195 mbsl, pumps off |
9 | 21:52:07 | Start lowering probe |
10 | 21:55:00 | CDS lands in BHA; pumps off |
11 | 21:56:30 | Start penetration of T2P into sediment |
12 | 21:57:25 | End of T2P penetration; bit on bottom of hole |
13 | 21:57:44 | Raising BHA 2.5 m off bottom of hole |
14 | 23:02:47 | Pulling T2P uphole slowly with wireline |
15 | 23:09:44 | Stop at 1057 mbsl, pumps off |
16 | 23:14:53 | Pulling T2P uphole slowly with wireline |
17 | 23:18:53 | Stop at 741 mbsl, pumps off |
18 | 23:21:27 | Pulling T2P uphole slowly with wireline |
19 | 23:24:07 | Stop at 491 mbsl, pumps off |
20 | 23:26:07 | Pulling T2P uphole slowly with wireline |