Previous   |    Close   |    Next

Table T26. Event summary of T2P Deployment 14, Hole U1324C.

Event Time
(GMT)
Event
1   Data logger started at 1 Hz
2 21:28:16 Stop at 491 mbsl, pumps off
3 21:30:16 Start lowering probe
4 21:35:17 Stop at 741 mbsl, pumps off
5 21:37:29 Start lowering probe
6 21:43:36 Stop at 1057 mbsl, pumps off
7 21:45:49 Start lowering probe
8 21:49:31 Stop at 1195 mbsl, pumps off
9 21:52:07 Start lowering probe
10 21:55:00 CDS lands in BHA; pumps off
11 21:56:30 Start penetration of T2P into sediment
12 21:57:25 End of T2P penetration; bit on bottom of hole
13 21:57:44 Raising BHA 2.5 m off bottom of hole
14 23:02:47 Pulling T2P uphole slowly with wireline
15 23:09:44 Stop at 1057 mbsl, pumps off
16 23:14:53 Pulling T2P uphole slowly with wireline
17 23:18:53 Stop at 741 mbsl, pumps off
18 23:21:27 Pulling T2P uphole slowly with wireline
19 23:24:07 Stop at 491 mbsl, pumps off
20 23:26:07 Pulling T2P uphole slowly with wireline
21   Data downloaded from data logger

Notes: Depth = 150.0 mbsf. Date = 26 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.

Previous   |    Close   |    Next   |    Top of page