Table T27. Event summary of T2P Deployment 15, Hole U1324C.

Event Time
(GMT)
Event
1 0:49:19 Data logger started at 1 Hz
2 1:56:31 T2P on rig floor
3 2:09:04 Start lowering T2P downhole, pumps on
4 2:17:40 Stop at 491 mbsl, pumps off
5 2:19:52 Start lowering probe
6 2:24:36 Stop at 741 mbsl, pumps off
7 2:26:51 Start lowering probe
8 2:32:55 Stop at 1057 mbsl, pumps off
9 2:35:34 Start lowering probe
10 2:40:23 Stop at 1245 mbsl, pumps off
11 2:43:42 Start lowering probe
12 2:47:37 CDS lands in BHA; pumps off
13 2:48:02 Start penetration of T2P into sediment
14 2:49:28 End of T2P penetration; bit 1 m off bottom of hole
15 2:52:20 Raising BHA 4.5 m off bottom of hole
16 3:53:17 Pulling T2P uphole slowly with wireline
17 3:56:56 Stop at 1057 mbsl, pumps off
18 3:59:23 Pulling T2P uphole slowly with wireline
19 4:02:52 Stop at 741 mbsl, pumps off
20 4:05:07 Pulling T2P uphole slowly with wireline
21 4:07:56 Stop at 491 mbsl, pumps off
22 4:10:05 Pulling T2P uphole slowly with wireline
23 4:15:55 Wireline disconnected from CDS
24 4:17:54 CDS disconnected from spacer
25 4:19:43 Spacer disconnected from CDS
26 4:21:51 T2P out of pipe
27   Data downloaded from data logger

Notes: Depth = 200.0 mbsf. Date = 27 June 2005. T2P = temperature/​dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.