Table T27. Event summary of T2P Deployment 15, Hole U1324C.
Event | Time (GMT) |
Event |
---|---|---|
1 | 0:49:19 | Data logger started at 1 Hz |
2 | 1:56:31 | T2P on rig floor |
3 | 2:09:04 | Start lowering T2P downhole, pumps on |
4 | 2:17:40 | Stop at 491 mbsl, pumps off |
5 | 2:19:52 | Start lowering probe |
6 | 2:24:36 | Stop at 741 mbsl, pumps off |
7 | 2:26:51 | Start lowering probe |
8 | 2:32:55 | Stop at 1057 mbsl, pumps off |
9 | 2:35:34 | Start lowering probe |
10 | 2:40:23 | Stop at 1245 mbsl, pumps off |
11 | 2:43:42 | Start lowering probe |
12 | 2:47:37 | CDS lands in BHA; pumps off |
13 | 2:48:02 | Start penetration of T2P into sediment |
14 | 2:49:28 | End of T2P penetration; bit 1 m off bottom of hole |
15 | 2:52:20 | Raising BHA 4.5 m off bottom of hole |
16 | 3:53:17 | Pulling T2P uphole slowly with wireline |
17 | 3:56:56 | Stop at 1057 mbsl, pumps off |
18 | 3:59:23 | Pulling T2P uphole slowly with wireline |
19 | 4:02:52 | Stop at 741 mbsl, pumps off |
20 | 4:05:07 | Pulling T2P uphole slowly with wireline |
21 | 4:07:56 | Stop at 491 mbsl, pumps off |
22 | 4:10:05 | Pulling T2P uphole slowly with wireline |
23 | 4:15:55 | Wireline disconnected from CDS |
24 | 4:17:54 | CDS disconnected from spacer |
25 | 4:19:43 | Spacer disconnected from CDS |
26 | 4:21:51 | T2P out of pipe |
27 | Data downloaded from data logger |
Notes: Depth = 200.0 mbsf. Date = 27 June 2005. T2P = temperature/dual pressure probe. CDS = colleted delivery system. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.