Previous   |    Close

Table T28. Event summary of T2P Deployment 16, Hole U1324C.

Event Time
(GMT)
Event
1   Data logger started at 1 Hz
2 11:18:00 Start lowering T2P downhole, pumps on
3 11:37:22 Stop at 491 mbsl, pumps off
4 11:39:35 Start lowering probe
5 11:43:21 Stop at 741 mbsl, pumps off
6 11:45:21 Start lowering probe
7 11:49:33 Stop at 1057 mbsl, pumps off
8 11:52:30 Start lowering probe
9 11:57:30 Stop at 1345 mbsl, pumps off
10 11:59:30 Start lowering probe
11 12:05:15 Start penetration of T2P into sediment
12 12:17:12 End of T2P penetration; bit on bottom of hole
13 12:22:15 Raising BHA 4 m off bottom of hole
14 13:47:24 Pulling T2P uphole slowly with wireline
15 13:54:09 Stop at 1057 mbsl, pumps off
16 13:57:00 Pulling T2P uphole slowly with wireline
17 14:02:33 Stop at 741 mbsl, pumps off
18 14:04:30 Pulling T2P uphole slowly with wireline
19 14:09:10 Stop at 491 mbsl, pumps off
20 14:11:10 Pulling T2P uphole slowly with wireline
21   Data downloaded from data logger

Notes: Depth = 300.0 mbsf. Date = 27 June 2005. T2P = temperature/​dual pressure probe. BHA = bottom-hole assembly. GMT = Greenwich Mean Time.

Previous   |    Close   |    Top of page