Table T3. Coring summary, Hole U1324C.
Hole U1324C |
Latitude: 28°4.7832′N |
Longitude: 89°8.3683′W |
Time on site (h): 50.25 |
Seafloor (drill pipe measurement from rig floor, mbrf): 1066.5 |
Distance between rig floor and sea level (m): 10.8 |
Water depth (drill pipe measurement from sea level, m): 1055.7 |
Total depth (drill pipe measurement from rig floor, mbrf): 1578.3 |
Total penetration (meters below seafloor, mbsf): 511.8 |
Total length of cored section: 55.1 |
Total core recovered: 55.57 |
Core recovery (%): 101 |
Total number of cores: 8 |
Core | Date (Jun 2005) |
Local time (h) |
Depth (mbsf) | Length (m) | Recovery (%) |
Comments | ||
---|---|---|---|---|---|---|---|---|
Top | Bottom | Cored | Recovered | |||||
308-U1324C- | ||||||||
1-0 | 26 | 0555 | 0.0 | 50.0 | XCB center bit; T2P probe | |||
1H | 26 | 0840 | 50.0 | 59.5 | 9.5 | 9.66 | 101.68 | |
2-1 | 26 | 1115 | 59.5 | 100.0 | T2P probe | |||
2H | 26 | 1405 | 100.0 | 109.0 | 9.0 | 9.01 | 100.11 | Advance by recovery |
3-2 | 26 | 1545 | 109.0 | 150.0 | T2P probe | |||
3H | 26 | 1910 | 150.0 | 155.5 | 5.5 | 5.52 | 100.36 | Advance by recovery |
4-3 | 26 | 2100 | 155.5 | 200.0 | T2P probe | |||
4H | 26 | 2355 | 200.0 | 206.4 | 6.4 | 6.50 | 101.56 | Advance by recovery |
5-4 | 27 | 0200 | 206.4 | 250.0 | DVTPP | |||
5H | 27 | 0450 | 250.0 | 258.3 | 8.3 | 8.38 | 100.96 | Advance by recovery |
6-5 | 27 | 0600 | 258.3 | 300.0 | T2P probe | |||
6H | 27 | 0950 | 300.0 | 304.2 | 4.2 | 4.24 | 100.95 | Advance by recovery |
7-6 | 27 | 1300 | 304.2 | 405.0 | DVTPP at 1471.5 m | |||
7H | 27 | 1600 | 405.0 | 410.4 | 5.4 | 5.41 | 100.19 | Advance by recovery |
8-7 | 27 | 1930 | 410.4 | 505.0 | DVTPP | |||
8H | 27 | 2350 | 505.0 | 511.8 | 6.8 | 6.85 | 100.74 | |
Cored totals: | 55.1 | 55.57 | 100.85 |
Notes: XCB = extended core barrel. T2P = pressure/dual pressure probe, DVTPP = Davis-Villinger Temperature-Pressure Probe.