Table T8. Summary calendar of vertical seismic profile measurements, Holes M0027A, M0028A, and M0029A. (See table notes.)

Hole Date
(2009)
Depth (m WSF) Spacing
(m)
Open hole survey
(m WSF)
Through-pipe survey
(m WSF)
Start End
M0027A 21 May 328.72 0.45 0.91 204–329 0–204
M0028A 16 Jun 667.94 395.45 1.83 PQ: 0–404
          HQ: 0–668
17 Jun 656.36 402.15 1.83 425–656 PQ: 0–404
          HQ: 0–425
18 Jun 431.53 20.05 1.83 404–432 PQ: 0–404
M0029A 11 Jul 753.42 207.83 3.05 0–753
14 Jul 226.12 12.76 3.05 0–226

Notes: — = tool not used. PQ = PQ diameter borehole, HQ = HQ diameter borehole.