Table T8. Summary calendar of vertical seismic profile measurements, Holes M0027A, M0028A, and M0029A. (See table notes.)
Hole |
Date (2009) |
Depth (m WSF) |
Spacing (m) |
Open hole survey (m WSF) |
Through-pipe survey (m WSF) |
|
---|---|---|---|---|---|---|
Start | End | |||||
M0027A | 21 May | 328.72 | 0.45 | 0.91 | 204–329 | 0–204 |
M0028A | 16 Jun | 667.94 | 395.45 | 1.83 | — | PQ: 0–404 |
HQ: 0–668 | ||||||
17 Jun | 656.36 | 402.15 | 1.83 | 425–656 | PQ: 0–404 | |
HQ: 0–425 | ||||||
18 Jun | 431.53 | 20.05 | 1.83 | 404–432 | PQ: 0–404 | |
M0029A | 11 Jul | 753.42 | 207.83 | 3.05 | — | 0–753 |
14 Jul | 226.12 | 12.76 | 3.05 | — | 0–226 |
Notes: — = tool not used. PQ = PQ diameter borehole, HQ = HQ diameter borehole.
Previous | Close | Next | Top of page