Figure F23. Azimuth of maximum principal horizontal stress estimated from borehole breakout images, Sites C0001, C0002 (in basin above 936 mbsf), C0004, and C0006 (red lines). Blue line = estimate for older accretionary prism formation below 936 mbsf at Site C0002.
Previous | Close | Next | Top of page