Figure F4. Diagram of experimental setup for Site C0001 and C0006 permeability samples. The specimen (Sp) is inserted in a jacket clamped on end pieces. Confining pressure (PC), upstream (Pup) and downstream (Pdown) pore fluid pressure, and circuits are indicated by solid lines.
Previous | Close | Next | Top of page