Table T1. Coring summary, Site U1357. (See table notes.)

Site U1357
Time on site (h): 63.4 (0800 h, 3 February–0900 h, 6 February 2010)
Hole U1357A
Latitude: 66°24.7991′S
Longitude: 140°25.5008′E
Time on hole (h): 27.33 (0800 h, 3 February–1120 h, 4 February 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 1025.9
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 1014.9
Total penetration (m DSF): 186.6
Total depth (drill pipe measurement from rig floor, m DRF): 1212.5
Total length of cored section (m): 186.6
Total core recovered (m): 183.87
Core recovery (%): 99
Total number of cores: 21
Hole U1357B
Latitude: 66°24.7990′S
Longitude: 140°25.5705′E
Time on hole (h): 16.33 (1120 h, 4 February–0340 h, 5 February 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 1028.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 1017.0
Total penetration (m DSF): 170.7
Total depth (drill pipe measurement from rig floor, m DRF): 1198.7
Total length of cored section (m): 170.7
Total core recovered (m): 172.44
Core recovery (%): 101
Total number of cores: 19
Hole U1357C
Latitude: 66°24.8013′S
Longitude: 140°25.4651′E
Time on hole (h): 19.75 (0340 h, 5 February–0900 h, 6 February 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 1027.7
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measurement from sea level, m): 1016.7
Total penetration (m DSF): 103.8
Total depth (drill pipe measurement from rig floor, m DRF): 1131.5
Total length of cored section (m): 103.8
Total core recovered (m): 110.71
Core recovery (%): 107
Total number of cores: 11
Core Date
(2010)
Local time
(h)
Depth DSF-B (m) Interval
advanced
(m)
Depth CSF-A (m) Length of core
recovered
(m)
Recovery
(%)
Top of
cored
interval
Bottom of
cored
interval
Top of
cored
interval
Bottom of
cored
interval
318-U1357A-
1H 3 Feb 1450 0.0 7.6 7.6 0.00 7.64 7.64 101
2H 3 Feb 1540 7.6 17.1 9.5 7.60 16.65 9.05 95
3H 3 Feb 1615 17.1 26.6 9.5 17.10 27.35 10.25 108
4H 3 Feb 1650 26.6 36.1 9.5 26.60 37.02 10.42 110
5H 3 Feb 1725 36.1 45.6 9.5 36.10 45.28 9.18 97
6H 3 Feb 1805 45.6 55.1 9.5 45.60 54.78 9.18 97
7H 3 Feb 1840 55.1 64.6 9.5 55.10 64.95 9.85 104
8H 3 Feb 1910 64.6 74.1 9.5 64.60 74.08 9.48 100
9H 3 Feb 1940 74.1 83.6 9.5 74.10 83.64 9.54 100
10H 3 Feb 2005 83.6 93.1 9.5 83.60 92.03 8.43 89
11H 3 Feb 2040 93.1 102.6 9.5 93.10 101.93 8.83 93
12H 3 Feb 2110 102.6 112.1 9.5 102.60 112.15 9.55 101
13H 3 Feb 2140 112.1 121.6 9.5 112.10 120.62 8.52 90
14H 3 Feb 2205 121.6 131.1 9.5 121.60 129.04 7.44 78
15H 3 Feb 2235 131.1 140.6 9.5 131.10 140.35 9.25 97
16H 3 Feb 2310 140.6 150.1 9.5 140.60 150.76 10.16 107
17H 3 Feb 2335 150.1 159.6 9.5 150.10 160.22 10.12 107
18H 4 Feb 0010 159.6 169.1 9.5 159.60 169.43 9.83 103
19H 4 Feb 0040 169.1 178.6 9.5 169.10 179.29 10.19 107
20H 4 Feb 0645 178.6 185.6 7.0 178.60 185.45 6.85 98
21X 4 Feb 0920 185.6 186.6 1.0 185.60 185.71 0.11 11
Cored totals: 186.6     183.87 99
Total interval cored: 186.6        
318-U1357B-
1H 4 Feb 1410 0.0 2.5 2.5 0.00 2.49 2.49 100
2H 4 Feb 1625 2.5 12.0 9.5 2.50 12.29 9.79 103
3H 4 Feb 1700 12.0 21.5 9.5 12.00 22.28 10.28 108
4H 4 Feb 1740 21.5 31.0 9.5 21.50 31.70 10.20 107
5H 4 Feb 1820 31.0 40.5 9.5 31.00 41.31 10.31 109
6H 4 Feb 1850 40.5 50.0 9.5 40.50 50.43 9.93 105
7H 4 Feb 1920 50.0 59.5 9.5 50.00 59.08 9.08 96
8H 4 Feb 1950 59.5 69.0 9.5 59.50 66.77 7.27 77
9H 4 Feb 2030 69.0 78.5 9.5 69.00 78.09 9.09 96
10H 4 Feb 2100 78.5 88.0 9.5 78.50 87.86 9.36 99
11H 4 Feb 2130 88.0 97.5 9.5 88.00 97.33 9.33 98
12H 4 Feb 2150 97.5 107.0 9.5 97.50 106.82 9.32 98
13H 4 Feb 2220 107.0 116.5 9.5 107.00 117.02 10.02 105
14H 4 Feb 2250 116.5 126.0 9.5 116.50 126.05 9.55 101
15H 4 Feb 2320 126.0 135.5 9.5 126.00 135.51 9.51 100
16H 4 Feb 2350 135.5 145.0 9.5 135.50 145.18 9.68 102
17H 5 Feb 0035 145.0 154.5 9.5 145.00 155.19 10.19 107
18H 5 Feb 0107 154.5 164.0 9.5 154.50 164.77 10.27 108
19H 5 Feb 0150 164.0 170.7 6.7 164.00 170.77 6.77 101
Cored totals: 170.7     172.44 101
Total interval cored: 170.7        
318-U1357C-
1H 5 Feb 0705 0.0 8.8 8.8 0.00 8.78 8.78 100
2H 5 Feb 0750 8.8 18.3 9.5 8.80 18.82 10.02 105
3H 5 Feb 0815 18.3 27.8 9.5 18.30 28.81 10.51 111
4H 5 Feb 0850 27.8 37.3 9.5 27.80 38.10 10.30 108
5H 5 Feb 0925 37.3 46.8 9.5 37.30 47.50 10.20 107
6H 5 Feb 1000 46.8 56.3 9.5 46.80 56.84 10.04 106
7H 5 Feb 1030 56.3 65.8 9.5 56.30 66.41 10.11 106
8H 5 Feb 1125 65.8 75.3 9.5 65.80 75.87 10.07 106
9H 5 Feb 1205 75.3 84.8 9.5 75.30 85.34 10.04 106
10H 5 Feb 1235 84.8 94.3 9.5 84.80 95.26 10.46 110
11H 5 Feb 1300 94.3 103.8 9.5 94.30 104.48 10.18 107
Cored totals: 103.8     110.71 107
Total interval cored: 103.8        

Notes: DRF = drilling depth below rig floor. DSF-A = drilling depth below seafloor determined by tagging seafloor, DSF-B = drilling depth below seafloor determined by mudline core recovery, CSF-A = core depth below seafloor, overlap if long. Local time = UTC + 11 h.