Close   |    Next

Table T1. Coring summary, Site U1359. (See table notes.)

Site U1359
Time on site (h): 209.75
Holes U1359A, U1359B, and U1359C
89.25 (0700 h, 8 February–0015 h, 12 February 2010)
Hole U1359D
120.50 (2215 h, 19 February–2245 h, 24 February 2010)
Hole U1359A
Latitude: 64°54.2377′S
Longitude: 143°57.6825′E
Time on hole (h): 34.00 (0700 h, 8 February–1700 h, 9 February 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 3020.9
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 3009.9
Total penetration (m DSF): 193.5
Total depth (drill pipe measurement from rig floor, m DRF): 3214.4
Total length of cored section (m): 193.5
Total core recovered (m): 154.1
Core recovery (%): 80
Total number of cores: 22
Hole U1359B
Latitude: 64°54.2431′S
Longitude: 143°57.6553′E
Time on hole (h): 29.67 (1700 h, 9 February–2240 h, 10 February 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 3018.8
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 3007.7
Total penetration (m DSF): 252.0
Total depth (drill pipe measurement from rig floor, m DRF): 3270.8
Total length of cored section (m): 252.0
Total core recovered (m): 198.92
Core recovery (%): 79
Total number of cores: 28
Hole U1359C
Latitude: 64°54.2477′S
Longitude: 143°57.6248′E
Time on hole (h): 25.58 (2240 h, 10 February–0015 h, 12 February 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 3022.3
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 3011.1
Total penetration (m DSF): 168.7
Total depth (drill pipe measurement from rig floor, m DRF): 3191.0
Total length of cored section (m): 168.7
Total core recovered (m): 150.73
Core recovery (%): 89
Total number of cores: 18
Hole U1359D
Latitude: 64°54.2596′S
Longitude: 143°57.5624′E
Time on hole (h): 120.5 (2215 h, 19 February–2245 h, 24 February 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 3023.0
Distance between rig floor and sea level (m): 11.1
Water depth (drill pipe measurement from sea level, m): 3011.9
Total penetration (m DSF): 602.2
Total depth (drill pipe measurement from rig floor, m DRF): 3625.2
Total length of cored section (m): 450.0
Total core recovered (m): 269.72
Core recovery (%): 60
Total number of cores: 47
Core Date
(2010)
Local time
(h)
Depth DSF-B (m) Interval
advanced
(m)
Depth CSF-A (m) Length of core
recovered
(m)
Recovery
(%)
Top of
cored
interval
Bottom of
cored
interval
Top of
cored
interval
Bottom of
cored
interval
318-U1359A-
1H 8 Feb 1820 0.0 0.6 0.6 0.00 0.67 0.67 112
2H 8 Feb 1920 0.6 10.1 9.5 0.60 9.54 8.94 94
3H 8 Feb 2000 10.1 19.6 9.5 10.10 19.32 9.22 97
4H 8 Feb 2100 19.6 29.1 9.5 19.60 28.56 8.96 94
5H 8 Feb 2140 29.1 38.6 9.5 29.10 29.34 0.24 3
6H 8 Feb 2230 38.6 48.1 9.5 38.60 47.73 9.13 96
7H 8 Feb 2330 48.1 57.6 9.5 48.10 55.37 7.27 77
8H 9 Feb 0025 57.6 67.1 9.5 57.60 66.60 9.00 95
9H 9 Feb 0120 67.1 76.6 9.5 67.10 75.80 8.70 92
10H 9 Feb 0220 76.6 86.1 9.5 76.60 86.56 9.96 105
11H 9 Feb 0305 86.1 95.6 9.5 86.10 95.22 9.12 96
12H 9 Feb 0355 95.6 105.1 9.5 95.60 104.89 9.29 98
13H 9 Feb 0455 105.1 114.6 9.5 105.10 115.05 9.95 105
14H 9 Feb 0545 114.6 124.1 9.5 114.60 124.26 9.66 102
15H 9 Feb 0630 124.1 133.6 9.5 124.10 133.70 9.60 101
16H 9 Feb 0715 133.6 143.1 9.5 133.60 135.80 2.20 23
17H 9 Feb 0815 143.1 145.4 2.3 143.10 145.46 2.36 103
18X 9 Feb 1045 145.4 155.0 9.6 145.40 153.96 8.56 89
19X 9 Feb 1205 155.0 164.6 9.6 155.00 161.88 6.88 72
20X 9 Feb 1255 164.6 174.2 9.6 164.60 164.65 0.05 1
21X 9 Feb 1355 174.2 183.9 9.7 174.20 182.16 7.96 82
22X 9 Feb 1450 183.9 193.5 9.6 183.90 190.26 6.36 66
Cored totals: 193.5     154.08 80
Total interval cored: 193.5        
318-U1359B-
1H 9 Feb 1835 0.0 7.7 7.7 0.00 7.74 7.74 101
2H 9 Feb 1930 7.7 17.2 9.5 7.70 16.85 9.15 96
3H 9 Feb 2010 17.2 26.7 9.5 17.20 26.73 9.53 100
4H 9 Feb 2050 26.7 36.2 9.5 26.70 31.13 4.43 47
5H 9 Feb 2135 36.2 45.7 9.5 36.20 41.60 5.40 57
6H 9 Feb 2215 45.7 55.2 9.5 45.70 53.67 7.97 84
7H 9 Feb 2335 55.2 64.7 9.5 55.20 63.52 8.32 88
8H 10 Feb 0040 64.7 74.2 9.5 64.70 74.22 9.52 100
9H 10 Feb 0125 74.2 83.7 9.5 74.20 83.78 9.58 101
10H 10 Feb 0205 83.7 93.2 9.5 83.70 93.14 9.44 99
11H 10 Feb 0250 93.2 102.7 9.5 93.20 101.97 8.77 92
12H 10 Feb 0345 102.7 112.2 9.5 102.70 112.55 9.85 104
13H 10 Feb 0430 112.2 121.7 9.5 112.20 120.32 8.12 85
14H 10 Feb 0525 121.7 131.2 9.5 121.70 128.67 6.97 73
15H 10 Feb 0610 131.2 140.7 9.5 131.20 134.84 3.64 38
16H 10 Feb 0655 140.7 150.2 9.5 140.70 146.35 5.65 59
17H 10 Feb 0750 150.2 159.7 9.5 150.20 159.54 9.34 98
18H 10 Feb 0835 159.7 169.2 9.5 159.70 169.24 9.54 100
19H 10 Feb 0925 169.2 178.7 9.5 169.20 178.59 9.39 99
20H 10 Feb 1015 178.7 188.2 9.5 178.70 188.12 9.42 99
21H 10 Feb 1105 188.2 197.7 9.5 188.20 198.15 9.95 105
22H 10 Feb 1155 197.7 207.2 9.5 197.70 207.73 10.03 106
23H 10 Feb 1245 207.2 209.0 1.8 207.20 209.04 1.84 102
24X 10 Feb 1510 209.0 213.7 4.7 209.00 210.46 1.46 31
25X 10 Feb 1605 213.7 223.3 9.6 213.70 223.36 9.66 101
26X 10 Feb 1700 223.3 232.8 9.5 223.30 226.64 3.34 35
27X 10 Feb 1820 232.8 242.4 9.6 232.80 232.96 0.16 2
28X 10 Feb 1930 242.4 252.0 9.6 242.40 243.11 0.71 7
Cored totals: 252.0     198.92 79
Total interval cored: 252.0        
318-U1359C-
1H 11 Feb 0005 0.0 7.2 7.2 0.00 7.25 7.25 101
2H 11 Feb 0105 7.2 16.7 9.5 7.20 7.20 0.00 0
3H 11 Feb 0230 16.7 26.2 9.5 16.70 26.60 9.90 104
4H 11 Feb 0320 26.2 35.7 9.5 26.20 36.03 9.83 103
5H 11 Feb 0405 35.7 45.2 9.5 35.70 45.62 9.92 104
6H 11 Feb 0500 45.2 54.7 9.5 45.20 54.88 9.68 102
7H 11 Feb 0540 54.7 64.2 9.5 54.70 63.94 9.24 97
8H 11 Feb 0625 64.2 73.7 9.5 64.20 74.20 10.00 105
9H 11 Feb 0710 73.7 83.2 9.5 73.70 83.25 9.55 101
10H 11 Feb 0800 83.2 92.7 9.5 83.20 92.90 9.70 102
11H 11 Feb 0850 92.7 102.2 9.5 92.70 101.32 8.62 91
12H 11 Feb 0935 102.2 111.7 9.5 102.20 110.61 8.41 89
13H 11 Feb 1025 111.7 121.2 9.5 111.70 120.29 8.59 90
14H 11 Feb 1115 121.2 130.7 9.5 121.20 124.28 3.08 32
15H 11 Feb 1205 130.7 140.2 9.5 130.70 140.61 9.91 104
16H 11 Feb 1250 140.2 149.7 9.5 140.20 150.24 10.04 106
17H 11 Feb 1340 149.7 159.2 9.5 149.70 156.87 7.17 75
18H 11 Feb 1425 159.2 168.7 9.5 159.20 169.04 9.84 104
Cored totals: 168.7     150.73 89
Total interval cored: 168.7        
      Depth DSF-A (m)        
Top of cored interval Bottom of cored interval    
318-U1359D-
1W 20 Feb 1150 0.0 152.2 152.2 0.00 0.15 0.15 0
2R 20 Feb 1250 152.2 161.8 9.6 152.20 159.95 7.75 81
3R 20 Feb 1335 161.8 171.3 9.5 161.80 171.12 9.32 98
4R 20 Feb 1420 171.3 180.9 9.6 171.30 180.00 8.70 91
5R 20 Feb 1510 180.9 190.5 9.6 180.90 188.07 7.17 75
6R 20 Feb 1555 190.5 200.1 9.6 190.50 200.32 9.82 102
7R 20 Feb 1640 200.1 209.7 9.6 200.10 209.40 9.30 97
8R 20 Feb 1730 209.7 219.3 9.6 209.70 216.64 6.94 72
9R 20 Feb 1815 219.3 228.9 9.6 219.30 227.73 8.43 88
10R 20 Feb 1900 228.9 238.4 9.5 228.90 238.77 9.87 104
11R 20 Feb 1945 238.4 248.0 9.6 238.40 248.22 9.82 102
12R 20 Feb 2035 248.0 257.6 9.6 248.00 253.66 5.66 59
13R 20 Feb 2125 257.6 267.2 9.6 257.60 264.06 6.46 67
14R 20 Feb 2215 267.2 276.8 9.6 267.20 276.07 8.87 92
15R 20 Feb 2300 276.8 286.3 9.5 276.80 283.43 6.63 70
16R 20 Feb 2355 286.3 295.9 9.6 286.30 295.95 9.65 101
17R 21 Feb 0105 295.9 305.5 9.6 295.90 300.99 5.09 53
18R 21 Feb 0210 305.5 315.1 9.6 305.50 312.90 7.40 77
19R 21 Feb 0325 315.1 324.7 9.6 315.10 320.83 5.73 60
20R 21 Feb 0420 324.7 334.3 9.6 324.70 331.36 6.66 69
21R 21 Feb 0555 334.3 343.9 9.6 334.30 341.57 7.27 76
22R 21 Feb 0655 343.9 353.5 9.6 343.90 348.94 5.04 52
23R 21 Feb 0810 353.5 362.8 9.3 353.50 358.14 4.64 50
24R 21 Feb 0910 362.8 372.4 9.6 362.80 371.86 9.06 94
25R 21 Feb 1010 372.4 382.0 9.6 372.40 374.11 1.71 18
26R 21 Feb 1115 382.0 391.6 9.6 382.00 382.00 0.00 0
27R 21 Feb 1220 391.6 401.2 9.6 391.60 391.62 0.02 0
28R 21 Feb 1320 401.2 410.8 9.6 401.20 401.20 0.00 0
29R 21 Feb 1430 410.8 420.4 9.6 410.80 412.83 2.03 21
30R 21 Feb 1520 420.4 430.0 9.6 420.40 424.08 3.68 38
31R 21 Feb 1615 430.0 439.6 9.6 430.00 431.04 1.04 11
32R 21 Feb 1710 439.6 449.2 9.6 439.60 446.36 6.76 70
33R 21 Feb 1805 449.2 458.7 9.5 449.20 457.23 8.03 85
34R 21 Feb 1900 458.7 468.2 9.5 458.70 464.36 5.66 60
35R 21 Feb 2000 468.2 477.8 9.6 468.20 474.91 6.71 70
36R 21 Feb 2100 477.8 487.4 9.6 477.80 481.38 3.58 37
37R 21 Feb 2150 487.4 497.0 9.6 487.40 492.02 4.62 48
38R 21 Feb 2250 497.0 506.6 9.6 497.00 500.08 3.08 32
39R 21 Feb 2350 506.6 516.2 9.6 506.60 514.51 7.91 82
40R 22 Feb 0055 516.2 525.8 9.6 516.20 520.60 4.40 46
41R 22 Feb 0205 525.8 535.4 9.6 525.80 531.72 5.92 62
42R 22 Feb 0310 535.4 545.0 9.6 535.40 539.42 4.02 42
43R 22 Feb 0430 545.0 554.6 9.6 545.00 549.09 4.09 43
44R 22 Feb 0530 554.6 563.8 9.2 554.60 558.42 3.82 42
45R 22 Feb 0640 563.8 573.4 9.6 563.80 567.44 3.64 38
46R 22 Feb 0750 573.4 583.0 9.6 573.40 576.45 3.05 32
47R 22 Feb 0940 583.0 592.6 9.6 583.00 589.96 6.96 72
48R 22 Feb 1145 592.6 602.2 9.6 592.60 596.31 3.71 39
Cored totals: 602.2     269.72 60
Total interval cored: 450.0        

Notes: DRF = drilling depth below rig floor. DSF-A = drilling depth below seafloor determined by tagging seafloor, DSF-B = drilling depth below seafloor determined by mudline core recovery, CSF-A = core depth below seafloor, overlap if long. Local time = UTC + 11 h.

Close   |    Next   |    Top of page