Table T1. Coring summary, Site U1360. (See table notes.)
Site U1360 |
Time on site (h): 31.0 (2315 h, 12 February–0615 h, 14 February 2010) |
Hole U1360A |
Latitude: 66°22.0395′S |
Longitude: 142°44.7050′E |
Time on hole (h): 31.0 (2315 h, 12 February–0615 h, 14 February 2010) |
Seafloor (drill pipe measurement from rig floor, m DRF): 506.0 |
Distance between rig floor and sea level (m): 11.0 |
Water depth (drill pipe measurement from sea level, m): 495.0 |
Total penetration (m DSF): 70.8 |
Total depth (drill pipe measurement from rig floor, m DRF): 576.8 |
Total length of cored section (m): 70.8 |
Total core recovered (m): 7.0 |
Core recovery (%): 10 |
Total number of cores: 7 |
Core |
Date (2010) |
Local time (h) |
Depth DSF-A (m) |
Interval advanced (m) |
Depth CSF-A (m) |
Length of core recovered (m) |
Recovery (%) |
||
---|---|---|---|---|---|---|---|---|---|
Top of cored interval |
Bottom of cored interval |
Top of cored interval |
Bottom of cored interval |
||||||
318-U1360A- | |||||||||
1R | 13 Feb | 0650 | 0.0 | 14.3 | 14.3 | 0.00 | 0.60 | 0.60 | 4 |
2R | 13 Feb | 1005 | 14.3 | 23.3 | 9.0 | 14.30 | 14.52 | 0.22 | 2 |
3R | 13 Feb | 1320 | 23.3 | 32.6 | 9.3 | 23.30 | 23.76 | 0.46 | 5 |
4R | 13 Feb | 1745 | 32.6 | 41.9 | 9.3 | 32.60 | 35.36 | 2.76 | 30 |
5R | 13 Feb | 1915 | 41.9 | 51.2 | 9.3 | 41.90 | 42.31 | 0.41 | 4 |
6R | 13 Feb | 2015 | 51.2 | 61.0 | 9.8 | 51.20 | 53.78 | 2.58 | 26 |
7R | 13 Feb | 2200 | 61.0 | 70.8 | 9.8 | 61.00 | 61.00 | 0.00 | 0 |
Cored totals: | 70.8 | 7.03 | 10 | ||||||
Total interval cored: | 70.8 |