Close   |    Next

Table T1. Coring summary, Site U1361. (See table notes.)

Site U1361
Time on site (h): 124.8 (1945 h, 25 February–0030 h, 3 March 2010)
Hole U1361A
Latitude: 64°24.5728′S
Longitude: 143°53.1992′E
Time on hole (h): 106.3 (1945 h, 25 February–0605 h, 2 March 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 3465.5
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 3454.3
Total penetration (m DSF): 388.0
Total depth (drill pipe measurement from rig floor, m DRF): 3853.5
Total length of cored section (m): 388.0
Total core recovered (m): 338.9
Core recovery (%): 87
Total number of cores: 41
Hole U1361B
Latitude: 64°24.5454′S
Longitude: 143°53.1966′E
Time on hole (h): 18.4 (0605 h, 2 March–0030 h, 3 March 2010)
Seafloor (drill pipe measurement from rig floor, m DRF): 3466.9
Distance between rig floor and sea level (m): 11.2
Water depth (drill pipe measurement from sea level, m): 3455.7
Total penetration (m DSF): 12.1
Total depth (drill pipe measurement from rig floor, m DRF): 3479.0
Total length of cored section (m): 12.1
Total core recovered (m): 12.0
Core recovery (%): 100
Total number of cores: 2
Core Date
(2010)
Local time
(h)
Depth DSF-B (m) Interval
advanced
(m)
Depth CSF-A (m) Length of core
recovered
(m)
Recovery
(%)
Top of
cored
interval
Bottom of
cored
interval
Top of
cored
interval
Bottom of
cored
interval
318-U1361A-
1H 26 Feb 0730 0.0 9.0 9.0 0.00 9.03 9.03 100
2H 26 Feb 0830 9.0 18.5 9.5 9.00 19.04 10.04 106
3H 26 Feb 0925 18.5 28.0 9.5 18.50 28.26 9.76 103
4H 26 Feb 1020 28.0 37.5 9.5 28.00 36.53 8.53 90
5H 26 Feb 1115 37.5 47.0 9.5 37.50 47.42 9.92 104
6H 26 Feb 1205 47.0 56.5 9.5 47.00 56.72 9.72 102
7H 26 Feb 1310 56.5 66.0 9.5 56.50 66.55 10.05 106
8H 26 Feb 1405 66.0 75.5 9.5 66.00 75.17 9.17 97
9H 26 Feb 1450 75.5 85.0 9.5 75.50 85.49 9.99 105
10H 26 Feb 1600 85.0 94.5 9.5 85.00 94.99 9.99 105
11H 26 Feb 1645 94.5 104.0 9.5 94.50 104.26 9.76 103
12H 26 Feb 1735 104.0 113.5 9.5 104.00 111.32 7.32 77
13H 26 Feb 1845 113.5 123.0 9.5 113.50 122.57 9.07 95
14H 26 Feb 1925 123.0 132.5 9.5 123.00 132.57 9.57 101
15H 26 Feb 2010 132.5 142.0 9.5 132.50 141.76 9.26 97
16H 26 Feb 2100 142.0 151.5 9.5 142.00 151.70 9.70 102
17X 26 Feb 2235 151.5 158.2 6.7 151.50 160.34 8.84 132
18X 26 Feb 2340 158.2 167.8 9.6 158.20 167.10 8.90 93
19X 27 Feb 0040 167.8 177.4 9.6 167.80 167.80 0.00 0
20X 27 Feb 0150 177.4 187.0 9.6 177.40 184.41 7.01 73
21X 27 Feb 0255 187.0 196.6 9.6 187.00 187.00 0.00 0
22X 27 Feb 0405 196.6 206.2 9.6 196.60 205.21 8.61 90
23X 27 Feb 0510 206.2 215.8 9.6 206.20 215.90 9.70 101
24X 27 Feb 0605 215.8 225.4 9.6 215.80 219.12 3.32 35
25X 27 Feb 0715 225.4 235.0 9.6 225.40 234.82 9.42 98
26X 27 Feb 0840 235.0 244.6 9.6 235.00 244.24 9.24 96
27X 27 Feb 1000 244.6 254.2 9.6 244.60 253.02 8.42 88
28X 27 Feb 1055 254.2 263.8 9.6 254.20 263.91 9.71 101
29X 27 Feb 1143 263.8 273.4 9.6 263.80 273.42 9.62 100
30X 27 Feb 1245 273.4 283.0 9.6 273.40 273.55 0.15 2
31X 27 Feb 1340 283.0 292.5 9.5 283.00 283.09 0.09 1
32X 27 Feb 1615 292.5 302.0 9.5 292.50 302.10 9.60 101
33X 27 Feb 1710 302.0 311.6 9.6 302.00 311.68 9.68 101
34X 27 Feb 1820 311.6 321.2 9.6 311.60 321.07 9.47 99
35X 27 Feb 1930 321.2 330.8 9.6 321.20 331.03 9.83 102
36X 27 Feb 2020 330.8 340.4 9.6 330.80 340.41 9.61 100
37X 27 Feb 2120 340.4 350.0 9.6 340.40 349.99 9.59 100
38X 27 Feb 2215 350.0 359.6 9.6 350.00 359.78 9.78 102
39X 27 Feb 2310 359.6 368.9 9.3 359.60 369.26 9.66 104
40X 28 Feb 0010 368.9 378.4 9.5 368.90 378.72 9.82 103
41X 28 Feb 0120 378.4 388.0 9.6 378.40 386.31 7.91 82
Cored totals: 388.0     338.9 87
Total interval cored: 388.0        
318-U1361B-
1H 2 Mar 0900 0.0 2.6 2.6 0.00 2.64 2.64 102
2H 2 Mar 1115 2.6 12.1 9.5 2.60 12.00 9.40 99
Cored totals: 12.1     12.0 100
Total interval cored: 12.1        

Notes: DRF = drilling depth below rig floor. DSF-B = drilling depth below seafloor determined by mudline core recovery, CSF-A = core depth below seafloor, overlap if long. Local time = UTC + 11 h.

Close   |    Next   |    Top of page