Table T26. Event summary of SET-P tool Deployment 1, Hole C0011B, 8 September 2009. (See table note.)
Event number |
Time* (h) |
Event description |
---|---|---|
1 | 1423 | SET-P tool power on; data acquisition started |
2 | 1430 | SET-P tool on rig floor |
3 | 1502 | SET-P tool in drill pipe |
4 | 1506 | SET-P tool connected to colleted delivery system |
5 | 1515 | Start lowering SET-P tool downhole |
6 | 1532 | Stop at 988 mbsl; pumps off |
7 | 1534 | Start lowering SET-P tool downhole; pumps on |
8 | 1543 | Stop at 1989 mbsl; pumps off |
9 | 1546 | Start pulling SET-P tool uphole with wireline |
10 | 1610 | Disconnect SET-P tool from wireline |
11 | 1624 | Disconnect SET-P tool from colleted delivery system |
12 | 1625 | Pulled SET-P tool out of drill pipe |
13 | 1631 | Data acquisition stopped; data downloaded; SET-P tool power off |
Note: * = UTC + 9 h. SET-P = sediment temperature-pressure.