Table T26. Event summary of SET-P tool Deployment 1, Hole C0011B, 8 September 2009. (See table note.)

Event
number
Time*
(h)
Event description
1 1423 SET-P tool power on; data acquisition started
2 1430 SET-P tool on rig floor
3 1502 SET-P tool in drill pipe
4 1506 SET-P tool connected to colleted delivery system
5 1515 Start lowering SET-P tool downhole
6 1532 Stop at 988 mbsl; pumps off
7 1534 Start lowering SET-P tool downhole; pumps on
8 1543 Stop at 1989 mbsl; pumps off
9 1546 Start pulling SET-P tool uphole with wireline
10 1610 Disconnect SET-P tool from wireline
11 1624 Disconnect SET-P tool from colleted delivery system
12 1625 Pulled SET-P tool out of drill pipe
13 1631 Data acquisition stopped; data downloaded; SET-P tool power off

Note: * = UTC + 9 h. SET-P = sediment temperature-pressure.