Table T1. Coring summary, Site U1346. (See table notes.)
Site U1346 | |
Time on site (h): 128.5 (0930 h, 14 September–1800 h, 19 September 2009) | |
Hole U1346A | |
Latitude: 38º00.401'N | |
Longitude: 162º38.710'E | |
Time on hole (h): 128.5 (0930 h, 14 September–1800 h, 19 September 2009) | |
Seafloor (drill pipe measured below rig floor, m DRF): 3630.0 | |
Distance between rig floor and sea level (m): 11.0 | |
Water depth (drill pipe measured from sea level, mbsl): 3619.0 | |
Total depth (drill pipe measured from rig floor, m DRF): 3821.8 | |
Total penetration (drilling depth below seafloor, m DSF): 191.8 | |
Total length of cored section (m): 91.3 (52.6 in igneous basement) | |
Total core recovered (m): 25.7 | |
Core recovery (%): 28 (38.7 in igneous basement) | |
Total number of cores: 16 |
Notes: DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. Local time = UTC + 10 h.
Close | Next | Top of page