Table T1. Coring summary, Site U1347. (See table notes.)

Site U1347
Time on site (h): 250.5 (1730 h, 21 September–0400 h, 2 October 2009)
Hole U1347A
Latitude: 32°30.475'N
Longitude: 159°14.078'E
Time on hole (h): 250.5 (1730 h, 21 September–0400 h, 2 October 2009)
Seafloor (drill pipe measured below rig floor, m DRF): 3461.0
Distance between rig floor and sea level (m): 11.0
Water depth (drill pipe measured from sea level, mbsl): 3450.0
Total depth (drill pipe measured from rig floor, m DRF): 3778.5
Total penetration (drilling depth below seafloor, m DSF): 317.5
Total length of cored section (m): 246.5 (159.9 in igneous basement)
Total core recovered (m): 116.6
Core recovery (%): 47.1 (64.2 in igneous basement)
Total number of cores: 29
Core Depth DSF (m) Interval advanced
(m)
Length of core recovered
(m)
Recovery
(%)
Top of cored interval Bottom of cored interval
324-U1347A-
1W 0.0 71.0 71.0 0.17 0
2R 71.0 80.5 9.5 0.11 1
3R 80.5 90.1 9.6 0.15 2
4R 90.1 99.8 9.7 0.65 7
5R 99.8 109.3 9.5 1.04 11
6R 109.3 118.9 9.6 1.78 19
7R 118.9 128.6 9.7 5.20 54
8R 128.6 138.2 9.6 6.20 65
9R 138.2 147.8 9.6 0.27 3
10R 147.8 157.4 9.6 1.34 14
11R 157.4 159.6 2.2 0.84 38
12R 159.6 167.0 7.4 2.17 29
13R 167.0 176.6 9.6 7.71 80
14R 176.6 186.2 9.6 2.30 24
15R 186.2 194.8 8.6 1.47 17
16R 194.8 204.4 9.6 6.05 63
17R 204.4 214.0 9.6 3.87 40
18R 214.0 223.6 9.6 7.07 74
19R 223.6 233.2 9.6 4.10 43
20R 233.2 242.7 9.5 3.90 41
21R 242.7 252.4 9.7 4.65 48
22R 252.4 262.0 9.6 5.61 58
23R 262.0 271.6 9.6 6.05 63
24R 271.6 281.2 9.6 10.47 109
25R 281.2 290.7 9.5 7.61 80
26R 290.7 293.4 2.7 2.84 105
27R 293.4 300.4 7.0 6.62 95
28R 300.4 309.9 9.5 9.83 103
29R 309.9 317.5 7.6 6.11 80
Totals:
317.5 116.8 37
Totals without wash barrel:
246.5 116.6 47

Notes: DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. Local time = UTC + 10 h.