Table T1. Coring summary, Site U1350. (See table notes.)
Site U1350 | |
Time on site (h): 179.5 (0115 h, 13 October–1245 h, 20 October 2009) | |
Hole U1350A | |
Latitude: 36°04.491'N | |
Longitude: 159°17.065'E | |
Time on hole (h): 179.5 (0115 h, 13 October–1245 h, 20 October 2009) | |
Seafloor (drill pipe measured below rig floor, m DRF): 4067.0 | |
Distance between rig floor and sea level (m): 11.1 | |
Water depth (drill pipe measured from sea level, mbsl): 4055.9 | |
Total depth (drill pipe measured from rig floor, m DRF): 4382.8 | |
Total penetration (drilling depth below seafloor, m DSF): 315.8 | |
Total length of cored section (m): 211.2 (172.7 in igneous basement) | |
Total core recovered (m): 75.19 | |
Core recovery (%): 35.6 (43.2 igneous basement) | |
Total number of cores: 26 |
Notes: DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. Local time = UTC + 10 h.