Table T3. Coring summary, Site U1362. (See table notes.)

Hole U1362A
Latitude: 47°45.6628′N
Longitude: 127°45.6720′W
Time on hole (h): 719 (30 days)
Seafloor (drill pipe measurement from rig floor, m DRF): 2672
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 2661.1
Total penetration (drilling depth below seafloor, m DSF): 528
Total length of cored section (m): 150
Total core recovered (m): 44.4
Core recovery (%): 30
Total number of cores: 20
Hole U1362B
Latitude: 47°45.4997′N
Longitude: 127°45.7312′W
Time on hole (h): 427 (17.8 days)
Seafloor (drill pipe measurement from rig floor, m DRF): 2672
Distance between rig floor and sea level (m): 11.3
Water depth (drill pipe measurement from sea level, m): 2661.1
Total penetration (drilling depth below seafloor, m DSF): 359
Total length of cored section (m): 0
Total core recovered (m): 0
Core recovery (%): 0
Total number of cores: 0
Core
Date (2010)
Time
(UTC)
Depth DSF (m)
Interval advanced
(m)
Length of core recovered
(m)
Recovery (%)
Comments
Top of
cored interval
Bottom of
cored interval
327-U1362A-
11 12 Jul 1800 ***** Drilled from 0.0 to 53.5 m DSF ***** Drilled interval for 20 inch casing
12 14 Jul 0315 ***** Drilled from 53.5 to 230.0 m DSF ***** Drilled interval for 16 inch casing
13 14 Jul 0345 ***** Drilled from 230.0 to 236.0 m DSF ***** Drilled interval for 16 inch casing
14 21 Jul 1400 ***** Drilled from 236.0 to 308.0 m DSF ***** Drilled interval for 10-3/4 inch casing
15 22 Jul 0930 ***** Drilled from 308.0 to 346.0 m DSF ***** Drilled interval for 10-3/4 inch casing
2R 1 Aug 1235 346.0 352.6 6.6 1.99 30  
3R 1 Aug 1825 352.6 362.2 9.6 2.14 22  
4R 1 Aug 2135 362.2 364.7 2.5 0.58 23  
5R 2 Aug 0730 364.7 370.2 5.5 1.95 35  
6R 2 Aug 1600 370.2 379.8 9.6 2.42 25  
7R 3 Aug 1120 379.8 389.5 9.7 0.69 7  
8R 3 Aug 1610 389.5 399.2 9.7 2.22 23  
9R 3 Aug 2320 399.2 408.8 9.6 2.48 26  
10R 4 Aug 1030 408.8 414.9 6.1 0.24 4  
11R 4 Aug 1620 414.9 419.9 5.0 1.50 30  
12R 4 Aug 2300 419.9 429.5 9.6 2.17 23  
13R 5 Aug 0605 429.5 439.1 9.6 1.00 10  
14R 5 Aug 1230 439.1 448.6 9.5 1.62 17  
15R 7 Aug 0045 448.6 453.8 5.2 1.12 22  
16R 7 Aug 0845 453.8 458.4 4.6 3.36 73  
17R 7 Aug 1620 458.4 463.4 5.0 5.59 112  
18R 8 Aug 0045 463.4 472.0 8.6 7.50 87  
19R 8 Aug 1050 472.0 481.6 9.6 2.06 21  
20R 8 Aug 1615 481.6 490.3 8.7 1.74 20  
21R 8 Aug 1955 490.3 496.0 5.7 2.04 36  
221 10 Aug 1700 ***** Drilled from 496.0 to 528.0 m DSF ***** Drilled interval for 9-7/8 inch hole
Hole U1362A totals:
528.0 45.27 32.3  
327-U1362B-
11 17 Jul 1700 ***** Drilled from 0.0 to 53.5 m DSF ***** Drilled interval for 20 inch casing
12 18 Jul 2000 ***** Drilled from 53.5 to 242.0 m DSF ***** Drilled interval for 16 inch casing
13 18 Jul 2200 ***** Drilled from 242.0 to 250.0 m DSF ***** Drilled interval for 16 inch casing
14 31 Jul 2345 ***** Drilled from 250.0 to 272.0 m DSF ***** Drilled interval for 10-3/4 inch casing
15 22 Aug 1910 ***** Drilled from 272.0 to 339.0 m DSF ***** Drilled interval for 10-3/4 inch casing
16 25 Aug 0700 ***** Drilled from 339.0 to 359.0 m DSF ***** Drilled interval for 9-7/8 inch hole
Hole U1362B totals:
359.0 0.94 0  
Site U1362 totals:
887.0 46.21    

Notes: DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. UTC = Universal Time Coordinated. R = rotary core barrel core, numeric core type = drilled interval.

Previous   |    Close   |    Next   |    Top of page