Table T3. Coring summary, Site U1362. (See table notes.)
Hole U1362A | ||||||||
Latitude: 47°45.6628′N | ||||||||
Longitude: 127°45.6720′W | ||||||||
Time on hole (h): 719 (30 days) | ||||||||
Seafloor (drill pipe measurement from rig floor, m DRF): 2672 | ||||||||
Distance between rig floor and sea level (m): 11.3 | ||||||||
Water depth (drill pipe measurement from sea level, m): 2661.1 | ||||||||
Total penetration (drilling depth below seafloor, m DSF): 528 | ||||||||
Total length of cored section (m): 150 | ||||||||
Total core recovered (m): 44.4 | ||||||||
Core recovery (%): 30 | ||||||||
Total number of cores: 20 | ||||||||
Hole U1362B | ||||||||
Latitude: 47°45.4997′N | ||||||||
Longitude: 127°45.7312′W | ||||||||
Time on hole (h): 427 (17.8 days) | ||||||||
Seafloor (drill pipe measurement from rig floor, m DRF): 2672 | ||||||||
Distance between rig floor and sea level (m): 11.3 | ||||||||
Water depth (drill pipe measurement from sea level, m): 2661.1 | ||||||||
Total penetration (drilling depth below seafloor, m DSF): 359 | ||||||||
Total length of cored section (m): 0 | ||||||||
Total core recovered (m): 0 | ||||||||
Core recovery (%): 0 | ||||||||
Total number of cores: 0 | ||||||||
Core |
Date (2010) |
Time (UTC) |
Depth DSF (m) |
Interval advanced (m) |
Length of core recovered (m) |
Recovery (%) |
Comments |
|
---|---|---|---|---|---|---|---|---|
Top of cored interval |
Bottom of cored interval |
|||||||
327-U1362A- | ||||||||
11 | 12 Jul | 1800 | ***** Drilled from 0.0 to 53.5 m DSF ***** | Drilled interval for 20 inch casing | ||||
12 | 14 Jul | 0315 | ***** Drilled from 53.5 to 230.0 m DSF ***** | Drilled interval for 16 inch casing | ||||
13 | 14 Jul | 0345 | ***** Drilled from 230.0 to 236.0 m DSF ***** | Drilled interval for 16 inch casing | ||||
14 | 21 Jul | 1400 | ***** Drilled from 236.0 to 308.0 m DSF ***** | Drilled interval for 10-3/4 inch casing | ||||
15 | 22 Jul | 0930 | ***** Drilled from 308.0 to 346.0 m DSF ***** | Drilled interval for 10-3/4 inch casing | ||||
2R | 1 Aug | 1235 | 346.0 | 352.6 | 6.6 | 1.99 | 30 | |
3R | 1 Aug | 1825 | 352.6 | 362.2 | 9.6 | 2.14 | 22 | |
4R | 1 Aug | 2135 | 362.2 | 364.7 | 2.5 | 0.58 | 23 | |
5R | 2 Aug | 0730 | 364.7 | 370.2 | 5.5 | 1.95 | 35 | |
6R | 2 Aug | 1600 | 370.2 | 379.8 | 9.6 | 2.42 | 25 | |
7R | 3 Aug | 1120 | 379.8 | 389.5 | 9.7 | 0.69 | 7 | |
8R | 3 Aug | 1610 | 389.5 | 399.2 | 9.7 | 2.22 | 23 | |
9R | 3 Aug | 2320 | 399.2 | 408.8 | 9.6 | 2.48 | 26 | |
10R | 4 Aug | 1030 | 408.8 | 414.9 | 6.1 | 0.24 | 4 | |
11R | 4 Aug | 1620 | 414.9 | 419.9 | 5.0 | 1.50 | 30 | |
12R | 4 Aug | 2300 | 419.9 | 429.5 | 9.6 | 2.17 | 23 | |
13R | 5 Aug | 0605 | 429.5 | 439.1 | 9.6 | 1.00 | 10 | |
14R | 5 Aug | 1230 | 439.1 | 448.6 | 9.5 | 1.62 | 17 | |
15R | 7 Aug | 0045 | 448.6 | 453.8 | 5.2 | 1.12 | 22 | |
16R | 7 Aug | 0845 | 453.8 | 458.4 | 4.6 | 3.36 | 73 | |
17R | 7 Aug | 1620 | 458.4 | 463.4 | 5.0 | 5.59 | 112 | |
18R | 8 Aug | 0045 | 463.4 | 472.0 | 8.6 | 7.50 | 87 | |
19R | 8 Aug | 1050 | 472.0 | 481.6 | 9.6 | 2.06 | 21 | |
20R | 8 Aug | 1615 | 481.6 | 490.3 | 8.7 | 1.74 | 20 | |
21R | 8 Aug | 1955 | 490.3 | 496.0 | 5.7 | 2.04 | 36 | |
221 | 10 Aug | 1700 | ***** Drilled from 496.0 to 528.0 m DSF ***** | Drilled interval for 9-7/8 inch hole | ||||
Hole U1362A totals: |
528.0 | 45.27 | 32.3 | |||||
327-U1362B- | ||||||||
11 | 17 Jul | 1700 | ***** Drilled from 0.0 to 53.5 m DSF ***** | Drilled interval for 20 inch casing | ||||
12 | 18 Jul | 2000 | ***** Drilled from 53.5 to 242.0 m DSF ***** | Drilled interval for 16 inch casing | ||||
13 | 18 Jul | 2200 | ***** Drilled from 242.0 to 250.0 m DSF ***** | Drilled interval for 16 inch casing | ||||
14 | 31 Jul | 2345 | ***** Drilled from 250.0 to 272.0 m DSF ***** | Drilled interval for 10-3/4 inch casing | ||||
15 | 22 Aug | 1910 | ***** Drilled from 272.0 to 339.0 m DSF ***** | Drilled interval for 10-3/4 inch casing | ||||
16 | 25 Aug | 0700 | ***** Drilled from 339.0 to 359.0 m DSF ***** | Drilled interval for 9-7/8 inch hole | ||||
Hole U1362B totals: |
359.0 | 0.94 | 0 | |||||
Site U1362 totals: |
887.0 | 46.21 |
Notes: DRF = drilling depth below rig floor, DSF = drilling depth below seafloor. UTC = Universal Time Coordinated. R = rotary core barrel core, numeric core type = drilled interval.