Previous   |    Close   |    Next

Figure F7. Cartoon drawings of current configuration of Hole 395A CORK completion. A. Completion as currently installed (see Fig. F8). B. Vertical cross-section without ROV platform. The CORK casing broke off ~4 m below top of reentry cone. C, D. View down into throat of reentry cone, showing inferred length of tubing remaining in hole based on observations of recovered CORK head; tubing is displayed as directly vertical but is likely not; red circles show location of top of 24 inch transition tubing through which we infer the CORK fins were not able to pass.

Previous   |    Close   |    Next   |    Top of page