Previous   |    Close   |    Next

Figure F8. Near-bottom camera views of the current configuration of the Hole 395A CORK completion, showing reentry cone with off-center ROV platform. Tube extending down from the top in both images is the drill string with 10.75 inch casing running tool.

Previous   |    Close   |    Next   |    Top of page