Table T10. Dates and times of important Motion Decoupled Hydraulic Delivery System (MDHDS) testing events during Deployment 2, Site U1402.
Date (2012) |
Time (h) |
Event |
---|---|---|
7 Jun | 1900 | Complete wash down to 96.4 m DRF |
2115 | Deploy MDHDS | |
2239 | MDHDS unlatches, releasing T2P | |
2246 | MDHDS pressured up and T2P driven into formation | |
8 Jun | 0206 | Begin tripping pipe out of hole |
0357 | MDHDS recovered | |
1010 | MDHDS personnel depart R/V JOIDES Resolution |
Time is local ship time (Universal Time Coordinated – 3 h). T2P = temperature-dual-pressure probe.
Previous | Close | Next | Top of page