Previous   |    Close

Table T11. Detailed listing of Motion Decoupled Hydraulic Delivery System (MDHDS) events during Deployment 2, Site U1402.

Date (2012) Time
(h)
Elapsed time (s) Adjusted time (s) Label Event
7 Jun                   215406 0 –3,358 A Begin data collection
221140 1,054 –2,304 B Tool rests at 285 m DRF
222223 1,697 –1,661 C Tool rests at 645 m DRF (approximate mudline)
222628 1,942 –1,416 D Tool at BHA
223406 2,400 –958 E (1) Pressurize standpipe to unlatch; first attempt
223702 2,576 –782 E (2) Pressurize standpipe to unlatch; second attempt
223912 2,760 –598 E (3) Pressurize standpipe to unlatch; third attempt
224626 3,140 –218 F Pressurize standpipe; drive tool into formation
225004 3,358 0 G Circulation terminated
232644 5,558 2,200 H Communications tether severed
8 Jun       000534 7,888 4,530 I First series of attempts to remove tool (using BHA and wireline)
001404 8,398 5,040 J Second series of attempts to remove tool (using wireline)
021159 15,473 12,115 K Begin tripping pipe
035717 21,791 18,433 L MDHDS at surface

Elapsed time refers to a t = 0 of the start of temperature-dual-pressue probe (T2P) data recording, and adjusted time refers to a t = 0 of the start of pressure and temperature dissipation after the circulation pumps had been turned off. Letters in the Label column refer to the events in the last column and in Figures F33, F34, F35, F36, F37, and F38. BHA = bottom-hole assembly.

Previous   |    Close   |    Top of page