Table T6. Splice tie points, Site M0066.
Hole, core section, interval (cm) |
Depth (mbsf) |
Depth (mcd) |
Hole, core section, interval (cm) |
|
---|---|---|---|---|
347- | 347- | |||
M0066B-2H-3, 27 | 5.40 | 5.40 | Append | M0066B-3H-1, 10 |
M0066B-3H-1, 113 | 5.60 | 6.44 | Tie to | M0066A-3H-1, 30 |
M0066A-3H-2, 145 | 8.68 | 9.51 | Append | M0066A-4H-1, 8 |
M0066A-4H-1, 117 | 10.15 | 10.61 | Tie to | M0066B-5H-1, 54 |
M0066B-5H-2, 88 | 12.08 | 12.45 | Tie to | M0066A-6H-1, 18 |
Previous | Close | Next | Top of page