IODP

Next Section | Table of Contents

doi:10.2204/iodp.sp.301.2004


Figure F6. Multichannel seismic lines across proposed Site SR-2. This site is planned for a subsequent return expedition to conduct cross-borehole hydrologic experiments to the monitoring borehole installations deployed during this first Juan de Fuca expedition (Hole SR-1A, Site 1026, and Site 1027). Line locations are shown in Figure F4.

Next Section | Table of Contents