IODP

Next Section | Table of Contents

doi:10.2204/iodp.sp.301.2004


Site Summaries (continued)

Site: FR-1A
Priority:
Secondary
Position:
47°54.105'N, 128°33.468'W;
approved for 500 m radius surrounding position
Water depth (m):
2600
Target drilling depth (mbsf):
110
Approved maximum penetration (mbsf):
110
Survey coverage:
  • InLine 44
  • TR426
    • GeoB 00-365
    (track map–Fig F6; seismic profile–Fig. F7)
  • Objective:
    Drill a short series of sediment and shallow basement holes along the first buried basement ridge east of the spreading center to
  • Evaluate sediment properties
  • Document fluid chemistry and evidence for along-strike fluid flow
  • Determine the nature of hydrothermal alteration and microbiology in uppermost basement
    Sediment thickness = 40–60 m where basement comes closest to the seafloor
  • Drilling and logging program:
  • APC/XCB and RCB core through sediments and into uppermost basement
  • Core into upper basement
  • Temperature measurements (APCT, DVTP)
  • Potential water sampling (WSTP)
  • Nature of rock anticipated:
    Turbidites (sand, silt, clay) and hemipelagic mud, overlying basal

    Next Section | Table of Contents