Previous   |   Close   |   Next

Figure F6. High-resolution, time-migrated three-dimensional seismic profile through proposed Sites NT2-01 and NT2-03. Holes NT2-01B and NT2-03C will be drilled and cored, with Hole NT2-01B designated as the primary target. Casing will be installed in Hole NT2-03C. Gray lines = scheduled drilling depth targets for Expedition 316. The primary target zone is the package of bright reflectors interpreted to represent the shallow megasplay at ~4 s two-way traveltime (interpreted to be ~600–800 mbsf). Vertical exaggeration = 2.2.

Previous   |   Close   |   Next  |   Top of page