Previous   |   Close   |   Next

Figure F2. Spliced composite profile of a representative depth section from NanTroSEIZE three-dimensional (3-D) data volume (Moore et al., 2009) and Line 95 from Institute for Research on Earth Evolution mini-3-D seismic survey (Park et al., 2008). Projected positions of Stage 1 and 2 drilling sites, including Sites C0009, C0010, C0011, and C0012.

Previous   |   Close   |   Next   |   Top of page