Figure F4. Casing plan for top hole portion of riser hole, Site C0002. Hole will be suspended after 36 inch casing is set at 60 mbsf and 20 inch casing is run, set, and cemented at ~800 mbsf. If possible, casing will be run deeper than 800 mbsf to maximum possible depth.